Dates: | 1988-1991 |
Size: | 6 linear feet in 14 boxes |
Repository: | Chicago Public Library, Harold Washington Library Center, Special Collections, 400 S. State Street, Chicago, IL 60605 |
Collection Number: | spe.l00173 |
Immediate Source of Acquisition: | The Chicago Public Library purchased a complete set of the negatives from Peter Fish Studios in 1995. |
Conditions Governing Access: | Materials are open without restrictions. |
Conditions Governing Use: | Please consult staff to determine ability to reuse materials from collection. |
Preferred Citation: | When quoting material from this collection the preferred citation is: Chicago Public Library – Harold Washington Library Center Construction Photographs, [Box #, Folder #], Special Collections, Chicago Public Library |
Finding Aid Author: | Original author unknown, undated. Updated and ingested into ArchivesSpace by Johanna Russ, 2022. |
Abstract
This photographic collection documents the construction of the Harold Washington Library Center, the central library for the Chicago Public Library. Both interior and exterior shots were taken, and all aspects of the building’s construction are shown, including the erection of steel, the masonry work, the interior heating and air conditioning systems, and the installation of marble finishes and casework.
Biographical/Historical
The Harold Washington Library Center opened to the public in October 1991. It was the result of an ambitious international Design/Build competition which aimed to house the Central Library’s collection in one building. The winning team was SEBUS, comprising of Schal Associates Partnership, A. Epstein and Sons International, Hammond Beeby and Babka, and U.S. Equities Realty, Inc. The building measures over 750,000 square feet, has over 70 miles of shelving, cost $144 million and was completed on time and within the budget.
Scope and Contents
The construction photographs were taken during the construction of the Library by Peter Fish Studios. The collection consists of over 1,400 black and white prints taken from the beginning of the project in 1988 until completion in 1991. Both interior and exterior shots were taken and all aspects of the building’s construction are shown, including the erection of steel, the masonry work, the interior heating and air conditioning systems, and the installation of marble finishes and casework.
Arrangement
The photographs are arranged in their original order, namely chronological.
Subjects
- Peter Fish Studios
- Harold Washington Library Center (Chicago Public Library) — Archives.
- Libraries — Pictorial works.
Related Materials
Collection Inventory
Box 1 | Folder 1 | Auto, north east corner of site, State & Van Buren | 1988 December 7 |
Box 1 | Folder 2 | Looking west from State & Van Buren | 1988 December 7 |
Box 1 | Folder 3 | Looking south west from State & Van Buren | 1988 December 7 |
Box 1 | Folder 4 | Looking south from State & Van Buren | 1988 December 7 |
Box 1 | Folder 5 | Looking north from State & Congress | 1988 December 7 |
Box 1 | Folder 6 | Looking north west from State & Congress | 1988 December 7 |
Box 1 | Folder 7 | Looking west from State & Congress | 1988 December 7 |
Box 1 | Folder 8 | Looking east from Plymouth & Congress | 1988 December 7 |
Box 1 | Folder 9 | Looking north east from Plymouth & Congress | 1988 December 7 |
Box 1 | Folder 10 | Looking south from mid-section of site, west side | 1988 December 7 |
Box 1 | Folder 11 | Looking north east from mid-section of site, west side | 1988 December 7 |
Box 1 | Folder 12 | Looking south from Plymouth & Van Buren | 1988 December 7 |
Box 1 | Folder 13 | Looking south east from Plymouth & Van Buren | 1988 December 7 |
Box 1 | Folder 14 | South half of site from roof of Old Colony Building | 1988 December 7 |
Box 1 | Folder 15 | North half of site from roof of Old Colony Building | 1988 December 7 |
Box 1 | Folder 16 | Looking south at State & Van Buren | 1989 January 5 |
Box 1 | Folder 17 | Looking south west at State & Van Buren | 1989 January 5 |
Box 1 | Folder 18 | Looking north from State & Congress | 1989 January 5 |
Box 1 | Folder 19 | Looking west from State & Congress | 1989 January 5 |
Box 1 | Folder 20 | Looking east from Plymouth & Van Buren | 1989 January 5 |
Box 1 | Folder 21 | Looking south from Plymouth & Van Buren | 1989 January 5 |
Box 1 | Folder 22 | South half of site | 1989 January 5 |
Box 1 | Folder 23 | North half of site | 1989 January 5 |
Box 1 | Folder 24 | Looking south at State & Van Buren | 1989 January 31 |
Box 1 | Folder 25 | Looking south west at State & Van Buren | 1989 January 31 |
Box 1 | Folder 26 | Looking north from State & Congress | 1989 January 31 |
Box 1 | Folder 27 | Looking west from State & Congress | 1989 January 31 |
Box 1 | Folder 28 | Looking east from Plymouth & Van Buren | 1989 January 31 |
Box 1 | Folder 29 | Looking south from Plymouth & Van Buren | 1989 January 31 |
Box 1 | Folder 30 | South half of site | 1989 January 31 |
Box 1 | Folder 31 | North half of site | 1989 January 31 |
Box 1 | Folder 32 | 16” C.I. sewer, east side | 1989 January 31 |
Box 1 | Folder 33 | 16” C.I. sewer, east side | 1989 January 31 |
Box 1 | Folder 34 | City electric vault, south east corner | 1989 January 31 |
Box 1 | Folder 35 | Commonwealth Edison vault, south end | 1989 January 31 |
Box 1 | Folder 36 | Looking south | 1989 March 1 |
Box 1 | Folder 37 | Looking south east | 1989 March 1 |
Box 1 | Folder 38 | Looking west | 1989 March 1 |
Box 1 | Folder 39 | Looking south west | 1989 March 1 |
Box 1 | Folder 40 | Looking north | 1989 March 1 |
Box 1 | Folder 41 | Looking north west | 1989 March 1 |
Box 1 | Folder 42 | Looking at south half of site | 1989 March 1 |
Box 1 | Folder 43 | Looking at north half of site | 1989 March 1 |
Box 1 | Folder 44 | Looking south from north west corner | 1989 March 30 |
Box 1 | Folder 45 | Looking south east from north west corner | 1989 March 30 |
Box 1 | Folder 46 | Base plate of L column # 64 | 1989 March 30 |
Box 1 | Folder 47 | Looking west from north east corner | 1989 March 30 |
Box 1 | Folder 48 | Looking south west from north east corner | 1989 March 30 |
Box 1 | Folder 49 | Edison vaults | 1989 March 30 |
Box 1 | Folder 50 | Looking north from south east corner | 1989 March 30 |
Box 1 | Folder 51 | Looking north west from south east corner | 1989 March 30 |
Box 1 | Folder 52 | North east corner of job site J-16 | 1989 March 30 |
Box 1 | Folder 53 | North half from roof | 1989 March 30 |
Box 1 | Folder 54 | South half from roof | 1989 March 30 |
Box 1 | Folder 55 | G.V. North half | 1989 April 27 |
Box 1 | Folder 56 | G.V. South half | 1989 April 27 |
Box 1 | Folder 57 | G.V. Looking south | 1989 April 27 |
Box 1 | Folder 58 | G.V. Looking south east | 1989 April 27 |
Box 1 | Folder 59 | G.V. Looking west | 1989 April 27 |
Box 1 | Folder 60 | G.V. Looking south west | 1989 April 27 |
Box 1 | Folder 61 | G.V. Looking north | 1989 April 27 |
Box 1 | Folder 62 | G.V. Looking north west | 1989 April 27 |
Box 1 | Folder 63 | G.V. Looking north | 1989 April 27 |
Box 1 | Folder 64 | G.V. Looking north east | 1989 April 27 |
Box 1 | Folder 65 | Missing | |
Box 1 | Folder 66 | Looking south | 1989 May 30 |
Box 1 | Folder 67 | Looking south east | 1989 May 30 |
Box 1 | Folder 68 | Looking west | 1989 May 30 |
Box 1 | Folder 69 | Looking south west | 1989 May 30 |
Box 1 | Folder 70 | Looking east | 1989 May 30 |
Box 1 | Folder 71 | Looking north east | 1989 May 30 |
Box 1 | Folder 72 | North half | 1989 May 30 |
Box 1 | Folder 73 | South half | 1989 May 30 |
Box 1 | Folder 74 | Ground level, looking south west at foundation wall | 1989 June 29 |
Box 1 | Folder 75 | Ground level, looking south at foundation wall | 1989 June 29 |
Box 1 | Folder 76 | Ground level, looking west at ground floor DN. Col. 16 | 1989 June 29 |
Box 1 | Folder 77 | Ground level, looking west at ground floor DN. Col. 13½ | 1989 June 29 |
Box 1 | Folder 78 | Ground level, looking south from column M18 | 1989 June 29 |
Box 1 | Folder 79 | Ground level, looking south west at ground floor concrete place | 1989 June 29 |
Box 1 | Folder 80 | Ground level, looking south at ground floor audit opening | 1989 June 29 |
Box 1 | Folder 81 | Ground level, looking south at ground floor concrete place | 1989 June 29 |
Box 1 | Folder 82 | Ground level, looking north at column E13, ground floor place | 1989 June 29 |
Box 1 | Folder 83 | Ground level, looking east at south end | 1989 June 29 |
Box 1 | Folder 84 | Looking east, at north half | 1989 June 29 |
Box 1 | Folder 85 | Looking east, at south half | 1989 June 29 |
Box 1 | Folder 86 | Ground level, south east corner, north loading dock, looking north | 1989 July 31 |
Box 1 | Folder 87 | Ground level, south east corner, center loading dock, looking east | 1989 July 31 |
Box 1 | Folder 88 | Ground level, south east corner, north, 4 loading docks, looking north | 1989 July 31 |
Box 1 | Folder 89 | Ground level, south east corner, south, loading dock looking south | 1989 July 31 |
Box 1 | Folder 90 | Ground level, south east corner, north, ramp, looking north | 1989 July 31 |
Box 1 | Folder 91 | Mezzanine level, east elevation wall, looking north | 1989 July 31 |
Box 1 | Folder 92 | Ground level, # 6 line columns, looking east | 1989 July 31 |
Box 1 | Folder 93 | Ground level, forming column L-2, looking south east | 1989 July 31 |
Box 1 | Folder 94 | Ground level, east wall, looking north west | 1989 July 31 |
Box 1 | Folder 95 | Ground level, east wall WK platform, looking north | 1989 July 31 |
Box 1 | Folder 96 | Ground level, inclined column H-2, looking south | 1989 July 31 |
Box 1 | Folder 97 | Ground level, inclined column E-2, looking south east | 1989 July 31 |
Box 1 | Folder 98 | Second level, north east corner, form work, looking south | 1989 July 31 |
Box 1 | Folder 99 | Second level, north east corner, rebar, looking south west | 1989 July 31 |
Box 1 | Folder 100 | Second level, A-frame scaffolding, looking west | 1989 July 31 |
Box 2 | Folder 101 | Second level, removing east wall form, looking south west | 1989 July 31 |
Box 2 | Folder 102 | Second level, 15-line, looking north east | 1989 July 31 |
Box 2 | Folder 103 | Ground level, forming inclined column E-12, looking south | 1989 July 31 |
Box 2 | Folder 104 | G.V. from second level 13, looking south east | 1989 July 31 |
Box 2 | Folder 105 | G.V. from second level E12, looking north east | 1989 July 31 |
Box 2 | Folder 106 | Ground level access stairway at E-12, looking south | 1989 July 31 |
Box 2 | Folder 107 | Lower level G.V. at oculus, looking north | 1989 July 31 |
Box 2 | Folder 108 | Lower level, rakers through west wall line 7-8, looking west | 1989 July 31 |
Box 2 | Folder 109-127 | Missing | |
Box 2 | Folder 128 | Mezzanine level, looking from ground level parking area | 1989 August 30 |
Box 2 | Folder 129 | Ground level, external wall on Van Buren | 1989 August 30 |
Box 2 | Folder 130 | Auditorium transfer struts as viewed from ground level | 1989 August 30 |
Box 2 | Folder 131 | Second level, post tension beams stress end | 1989 August 30 |
Box 2 | Folder 132 | Second level, east escalator openings | 1989 August 30 |
Box 2 | Folder 133 | Ground level, external wall on State Street | 1989 August 30 |
Box 2 | Folder 134 | Underground 12KVA electrical feeders | 1989 August 30 |
Box 2 | Folder 135 | Lower level, electrical contractor stage area | 1989 August 30 |
Box 2 | Folder 136 | Red conc. Encasement of Ceco feeders | 1989 August 30 |
Box 2 | Folder 137 | Lower level, sprinkler mains | 1989 August 30 |
Box 2 | Folder 138 | Underground plumbing installation, south end | 1989 August 30 |
Box 2 | Folder 139 | Second level architectural column, looking north east | 1989 August 30 |
Box 2 | Folder 140 | Second level as viewed from south west corner | 1989 August 30 |
Box 2 | Folder 141 | Third level, post tension beam framework | 1989 August 30 |
Box 2 | Folder 142 | Third level, reinforced steel, looking north | 1989 August 30 |
Box 2 | Folder 143 | Second level, north wall built up, beam box out | 1989 August 30 |
Box 2 | Folder 144 | Third level, slab bulkhead, looking north east | 1989 August 30 |
Box 2 | Folder 145 | North west corner elevation | 1989 August 30 |
Box 2 | Folder 146 | North east corner | 1989 August 30 |
Box 2 | Folder 147 | North half of site | 1989 August 30 |
Box 2 | Folder 148 | South half of site | 1989 August 30 |
Box 2 | Folder 149 | South west corner | 1989 August 30 |
Box 2 | Folder 150 | South east corner | 1989 August 30 |
Box 2 | Folder 151 | Ground level, north west corner, mechanical duck work | 1989 September 14 |
Box 2 | Folder 152 | Ground level, concrete topping bulkheads | 1989 September 14 |
Box 2 | Folder 153 | Lower level, north west mechanical room | 1989 September 14 |
Box 2 | Folder 154 | Underground conduit installation | 1989 September 14 |
Box 2 | Folder 155 | Fourth level, freight R.O., elevator core wall | 1989 September 14 |
Box 2 | Folder 156 | Second level, exterior south wall | 1989 September 14 |
Box 2 | Folder 157 | South perimeter wall, built up beam | 1989 September 14 |
Box 2 | Folder 158 | Third level, perimeter slab edge | 1989 September 14 |
Box 2 | Folder 159 | Architectural column, patch procedure | 1989 September 14 |
Box 2 | Folder 160 | Perimeter wall, built up web extension | 1989 September 14 |
Box 2 | Folder 161 | Post tension cable | 1989 September 14 |
Box 2 | Folder 162 | Ground level, duck work | 1989 September 29 |
Box 2 | Folder 163 | Second level, concrete topping | 1989 September 29 |
Box 2 | Folder 164 | Concrete cover for underground conduit | 1989 September 29 |
Box 2 | Folder 165 | Concrete cover for underground conduit | 1989 September 29 |
Box 2 | Folder 166 | Rakers at south wall | 1989 September 29 |
Box 2 | Folder 167 | Third level, north wall | 1989 September 29 |
Box 2 | Folder 168 | North half of site | 1989 September 29 |
Box 2 | Folder 169 | South half of site | 1989 September 29 |
Box 2 | Folder 170 | South west corner | 1989 September 29 |
Box 2 | Folder 171 | South east corner | 1989 September 29 |
Box 2 | Folder 172 | North west corner | 1989 September 29 |
Box 2 | Folder 173 | North east corner | 1989 September 29 |
Box 2 | Folder 174 | G.V. looking north from roof | 1989 October 6 |
Box 2 | Folder 175 | North wall | 1989 October 6 |
Box 2 | Folder 176 | Ground level, auditorium | 1989 October 6 |
Box 2 | Folder 177 | West elevation | 1989 October 6 |
Box 2 | Folder 178 | Waterproof application at dock | 1989 October 6 |
Box 2 | Folder 179 | Ground level, storm drain installation | 1989 October 6 |
Box 2 | Folder 180 | Transfer structure as viewed from second level | 1989 October 12 |
Box 2 | Folder 181 | Second level south, electrified dock installation | 1989 October 12 |
Box 2 | Folder 182 | Fourth level, south west, dock pour | 1989 October 12 |
Box 2 | Folder 183 | Fourth level south, saw tooth perimeter beam | 1989 October 12 |
Box 2 | Folder 184 | Slab depression for electrical deck crossover | 1989 October 12 |
Box 2 | Folder 185 | Fourth level, electrical cave from north crane | 1989 October 12 |
Box 2 | Folder 186 | Electrical conduit installation | 1989 October 30 |
Box 2 | Folder 187 | Raker removal at elevator core | 1989 October 30 |
Box 2 | Folder 188 | Lower level, conduit installation | 1989 October 30 |
Box 2 | Folder 189 | SOG pour, south west corner | 1989 October 30 |
Box 2 | Folder 190 | SOG finish, south east corner | 1989 October 30 |
Box 2 | Folder 191 | Lower level, T-cav conduits | 1989 October 30 |
Box 2 | Folder 192 | Ground level, temporary winter enclosure | 1989 October 30 |
Box 2 | Folder 193 | Window arch. Form work at State Street | 1989 October 30 |
Box 2 | Folder 194 | Ground level south, fire sprinklers | 1989 October 30 |
Box 2 | Folder 195 | Water test, loading dock | 1989 October 30 |
Box 2 | Folder 196 | Lower level, spoil removal | 1989 October 30 |
Box 2 | Folder 197 | Embeds for conc. Structure | 1989 October 30 |
Box 2 | Folder 198 | Second level south, ductwork installation | 1989 October 30 |
Box 2 | Folder 199 | Second level, Vav boxes | 1989 October 30 |
Box 2 | Folder 200 | Third level, electrical deck | 1989 October 30 |
Box 3 | Folder 201 | Form work mobilization | 1989 October 30 |
Box 3 | Folder 202 | Fifth level, reinforced steel at elevator core | 1989 October 30 |
Box 3 | Folder 203 | Fifth level, south | 1989 October 30 |
Box 3 | Folder 204 | Sixth level, north | 1989 October 30 |
Box 3 | Folder 205 | Sixth level, south | 1989 October 30 |
Box 3 | Folder 206 | Fourth level, form work removal | 1989 October 30 |
Box 3 | Folder 207 | South west corner | 1989 October 30 |
Box 3 | Folder 208 | South east corner | 1989 October 30 |
Box 3 | Folder 209 | North east corner | 1989 October 30 |
Box 3 | Folder 210 | North west corner | 1989 October 30 |
Box 3 | Folder 211 | North half | 1989 October 30 |
Box 3 | Folder 212 | South half | 1989 October 30 |
Box 3 | Folder 213 | Mortar silo | 1989 November 16 |
Box 3 | Folder 214 | Skip hoist base pad | 1989 November 16 |
Box 3 | Folder 215 | Ground level, north west, pipe installation | 1989 November 16 |
Box 3 | Folder 216 | Auditorium wall footing | 1989 November 16 |
Box 3 | Folder 217 | Lower level, audio visual area | 1989 November 16 |
Box 3 | Folder 218 | Lower level, south west corner | 1989 November 16 |
Box 3 | Folder 219 | Lower level, west, conduit at raker | 1989 November 16 |
Box 3 | Folder 220 | Ground level, south east corner, mechanical | 1989 November 16 |
Box 3 | Folder 221 | Ground level, south west corner, mechanical | 1989 November 16 |
Box 3 | Folder 222 | Second level, south west corner, mechanical | 1989 November 16 |
Box 3 | Folder 223 | Complex lobby | 1989 November 16 |
Box 3 | Folder 224 | Ground level, fountain form work | 1989 November 16 |
Box 3 | Folder 225 | Third level, looking south | 1989 November 16 |
Box 3 | Folder 226 | Fourth level, north west corner | 1989 November 16 |
Box 3 | Folder 227 | Fourth level, north east corner | 1989 November 16 |
Box 3 | Folder 228 | Fifth level, north west corner | 1989 November 16 |
Box 3 | Folder 229 | Sixth level, south east corner | 1989 November 16 |
Box 3 | Folder 230 | Sixth level, south west corner shearwall | 1989 November 16 |
Box 3 | Folder 231 | Architectural column form work | 1989 November 16 |
Box 3 | Folder 232 | Seventh level, north ½ form work | 1989 November 16 |
Box 3 | Folder 233 | Ground level, hoist off load ramp | 1989 November 30 |
Box 3 | Folder 234 | Mechanical equipment glas. E | 1989 November 30 |
Box 3 | Folder 235 | Second level, south east, Vav box installation | 1989 November 30 |
Box 3 | Folder 236 | Second level, vent piping | 1989 November 30 |
Box 3 | Folder 237 | Second level, restroom plumbing | 1989 November 30 |
Box 3 | Folder 238 | Third level, looking north | 1989 November 30 |
Box 3 | Folder 239 | Third level, north west, mechanical installation | 1989 November 30 |
Box 3 | Folder 240 | Third level, block back-up layout | 1989 November 30 |
Box 3 | Folder 241 | Fourth level, south west, concrete topping | 1989 November 30 |
Box 3 | Folder 242 | Fifth level, north east | 1989 November 30 |
Box 3 | Folder 243 | Sixth level, north east, deck removal | 1989 November 30 |
Box 3 | Folder 244 | Sixth level, deck removal | 1989 November 30 |
Box 3 | Folder 245 | Seventh level, deck steel placement | 1989 November 30 |
Box 3 | Folder 246 | Eighth level, deck forming | 1989 November 30 |
Box 3 | Folder 247 | Eighth level, elevation core wall | 1989 November 30 |
Box 3 | Folder 248 | North elevation, north west corner | 1989 November 30 |
Box 3 | Folder 249 | North skip hoist installation | 1989 November 30 |
Box 3 | Folder 250 | North half | 1989 November 30 |
Box 3 | Folder 251 | South half | 1989 November 30 |
Box 3 | Folder 252 | South west corner | 1989 November 30 |
Box 3 | Folder 253 | Looking north | 1989 November 30 |
Box 3 | Folder 254 | South east corner | 1989 November 30 |
Box 3 | Folder 255 | East elevation | 1989 November 30 |
Box 3 | Folder 256 | Auditorium, looking south | 1989 December 12 |
Box 3 | Folder 257 | Lower level, cable tray, looking north west corner | 1989 December 12 |
Box 3 | Folder 258 | Lower level, SOG, elevator area | 1989 December 12 |
Box 3 | Folder 259 | Ground level, south west corner, mechanical | 1989 December 12 |
Box 3 | Folder 260 | Ground level, south east corner | 1989 December 12 |
Box 3 | Folder 261 | Second level, looking south | 1989 December 12 |
Box 3 | Folder 262 | Second level, escalator openings | 1989 December 12 |
Box 3 | Folder 263 | Second level, gas piping | 1989 December 12 |
Box 3 | Folder 264 | Second level, cooling tower piping | 1989 December 12 |
Box 3 | Folder 265 | Third level, looking north east | 1989 December 12 |
Box 3 | Folder 266 | Third level, south west corner | 1989 December 12 |
Box 3 | Folder 267 | Third level, block back-up | 1989 December 12 |
Box 3 | Folder 268 | Brick arch, block back-up | 1989 December 12 |
Box 3 | Folder 269 | Fifth level, slab topping, south east | 1989 December 12 |
Box 3 | Folder 270 | Fifth level, rub and patch architectural column | 1989 December 12 |
Box 3 | Folder 271 | Fifth level, south west corner | 1989 December 12 |
Box 3 | Folder 272 | Fourth level, looking south east | 1989 December 12 |
Box 3 | Folder 273 | Sixth level, looking south east | 1989 December 12 |
Box 3 | Folder 274 | Sixth level, looking north | 1989 December 12 |
Box 3 | Folder 275 | Seventh level, north west, form work removal | 1989 December 12 |
Box 3 | Folder 276 | Eighth level, north east | 1989 December 12 |
Box 3 | Folder 277 | Eighth level, west pour | 1989 December 12 |
Box 3 | Folder 278 | Eighth level, west pour | 1989 December 12 |
Box 3 | Folder 279 | Structure steel column base plate | 1989 December 12 |
Box 3 | Folder 280 | North elevation | 1989 December 29 |
Box 3 | Folder 281 | North west corner | 1989 December 29 |
Box 3 | Folder 282 | South west corner | 1989 December 29 |
Box 3 | Folder 283 | South east corner | 1989 December 29 |
Box 3 | Folder 284 | South elevation | 1989 December 29 |
Box 3 | Folder 285 | South west corner | 1989 December 29 |
Box 3 | Folder 286 | North half | 1989 December 29 |
Box 3 | Folder 287 | South half | 1989 December 29 |
Box 3 | Folder 288 | Raker removal | 1989 December 29 |
Box 3 | Folder 289 | SOG video auditorium | 1989 December 29 |
Box 3 | Folder 290 | TC/AV conduit auditorium | 1989 December 29 |
Box 3 | Folder 291 | MEP truck dock | 1989 December 29 |
Box 3 | Folder 292 | Stair erection | 1989 December 29 |
Box 3 | Folder 293 | Second level, plumbing rough-in | 1989 December 29 |
Box 3 | Folder 294 | Second level, electrical sprinklers | 1989 December 29 |
Box 3 | Folder 295 | Third level, north, block work | 1989 December 29 |
Box 3 | Folder 296 | Third level, HVAC south | 1989 December 29 |
Box 3 | Folder 297 | Fourth level, duct north | 1989 December 29 |
Box 3 | Folder 298 | Fourth level, building enclosure | 1989 December 29 |
Box 3 | Folder 299 | Fifth level, north east | 1989 December 29 |
Box 3 | Folder 300 | Stripping eighth level deck | 1989 December 29 |
Box 4 | Folder 301 | Eighth and ninth levels, columns scaffold | 1989 December 29 |
Box 4 | Folder 302 | Anchor bolts columns | 1989 December 29 |
Box 4 | Folder 303 | Lower level, T-cav conduit | 1990 January 12 |
Box 4 | Folder 304 | Lower level, fans units | 1990 January 12 |
Box 4 | Folder 305 | Lower level, electrical switchboards | 1990 January 12 |
Box 4 | Folder 306 | Lower level, slab in-fill at raker openings | 1990 January 12 |
Box 4 | Folder 307 | Ground level, masonry, south east corner | 1990 January 12 |
Box 4 | Folder 308 | Ground level, stair elevator core | 1990 January 12 |
Box 4 | Folder 309 | Second level, ductwork CMU stocking | 1990 January 12 |
Box 4 | Folder 310 | Second level, ductwork insulation | 1990 January 12 |
Box 4 | Folder 311 | Third level, looking north west | 1990 January 12 |
Box 4 | Folder 312 | Third level, looking south | 1990 January 12 |
Box 4 | Folder 313 | Fourth level, masonry, south east | 1990 January 12 |
Box 4 | Folder 314 | Fourth level, masonry, north | 1990 January 12 |
Box 4 | Folder 315 | Fifth level, CMU stocking | 1990 January 12 |
Box 4 | Folder 316 | Fifth level, south east | 1990 January 12 |
Box 4 | Folder 317 | Sixth level, looking south | 1990 January 12 |
Box 4 | Folder 318 | Seventh level, looking south east | 1990 January 12 |
Box 4 | Folder 319 | Eighth level, south end | 1990 January 12 |
Box 4 | Folder 320 | Ninth level, south end | 1990 January 12 |
Box 4 | Folder 321 | Ninth level, north end | 1990 January 12 |
Box 4 | Folder 322 | Ninth level, S.S., column anchor bolts | 1990 January 12 |
Box 4 | Folder 323 | Ninth level, S.S., column anchor bolts | 1990 January 12 |
Box 4 | Folder 324 | Toward cranes | 1990 January 12 |
Box 4 | Folder 325 | Wall form work dismantling | 1990 January 12 |
Box 4 | Folder 326 | Ninth level, east perimeter beam | 1990 January 12 |
Box 4 | Folder 327 | Ninth level, S.S., column anchor bolts | 1990 January 12 |
Box 4 | Folder 328 | Lower level, auditorium SOG | 1990 January 25 |
Box 4 | Folder 329 | Lower level, looking south west | 1990 January 25 |
Box 4 | Folder 330 | Ground level, garage topping slab | 1990 January 25 |
Box 4 | Folder 331 | Ground level, looking north east | 1990 January 25 |
Box 4 | Folder 332 | Back fill at north elevation | 1990 January 25 |
Box 4 | Folder 333 | Ground level, escalator landing | 1990 January 25 |
Box 4 | Folder 334 | Second level, pt stressing | 1990 January 25 |
Box 4 | Folder 335 | Complex lobby | 1990 January 25 |
Box 4 | Folder 336 | Second level, pt stressing | 1990 January 25 |
Box 4 | Folder 337 | North crane removal | 1990 January 25 |
Box 4 | Folder 338 | Third level, duct pressure test | 1990 January 25 |
Box 4 | Folder 339 | Third level, sprinkler pipe drain valve | 1990 January 25 |
Box 4 | Folder 340 | Brick arch mock-up | 1990 January 25 |
Box 4 | Folder 341 | Fourth level, looking south | 1990 January 25 |
Box 4 | Folder 342 | Fifth level, looking north west | 1990 January 25 |
Box 4 | Folder 343 | Fifth level, south west topping pour | 1990 January 25 |
Box 4 | Folder 344 | Sixth level, north east topping pour | 1990 January 25 |
Box 4 | Folder 345 | Sixth level, looking south | 1990 January 25 |
Box 4 | Folder 346 | Seventh level, looking north | 1990 January 25 |
Box 4 | Folder 347 | Seventh level, concrete arch beams | 1990 January 25 |
Box 4 | Folder 348 | Seventh level, looking south | 1990 January 25 |
Box 4 | Folder 349 | Eighth level, looking north west | 1990 January 25 |
Box 4 | Folder 350 | Eighth level, looking south | 1990 January 25 |
Box 4 | Folder 351 | Ninth level, elevation core wall | 1990 January 25 |
Box 4 | Folder 352 | Ninth level, looking south | 1990 January 25 |
Box 4 | Folder 353 | Ninth level, east elevation | 1990 January 25 |
Box 4 | Folder 354 | Ninth level, man hoist | 1990 January 25 |
Box 4 | Folder 355 | Plymouth Court | 1990 January 25 |
Box 4 | Folder 356 | Block wall, east elevation | 1990 January 25 |
Box 4 | Folder 357 | Deck pour last structure | 1990 January 25 |
Box 4 | Folder 358 | G.V., north half, looking east | 1990 January 25 |
Box 4 | Folder 359 | G.V., south half, looking east | 1990 January 25 |
Box 4 | Folder 360 | G.V., looking north east | 1990 January 25 |
Box 4 | Folder 361 | G.V., looking north west | 1990 January 25 |
Box 4 | Folder 362 | G.V., looking south | 1990 January 25 |
Box 4 | Folder 363 | Lower level, CMU auditorium wall | 1990 February 16 |
Box 4 | Folder 364 | Lower level, CMU wall | 1990 February 16 |
Box 4 | Folder 365 | Lower level, electrical cables, south east corner | 1990 February 16 |
Box 4 | Folder 366 | Lower level, CMU wall, south west corner | 1990 February 16 |
Box 4 | Folder 367 | Ground level, escalators, meze and fountain | 1990 February 16 |
Box 4 | Folder 368 | Ground level, loading dock area | 1990 February 16 |
Box 4 | Folder 369 | Second level, south west corner | 1990 February 16 |
Box 4 | Folder 370 | Second level, pt slab opening | 1990 February 16 |
Box 4 | Folder 371 | Third level, north | 1990 February 16 |
Box 4 | Folder 372 | Third level, south | 1990 February 16 |
Box 4 | Folder 373 | Third level, brick swingstage | 1990 February 16 |
Box 4 | Folder 374 | Third level, north stair | 1990 February 16 |
Box 4 | Folder 375 | Fourth level, south | 1990 February 16 |
Box 4 | Folder 376 | Fourth level, stair installation | 1990 February 16 |
Box 4 | Folder 377 | Fourth level, electrical cable tray | 1990 February 16 |
Box 4 | Folder 378 | Fifth level, looking north east | 1990 February 16 |
Box 4 | Folder 379 | Fifth level, HVAC installation | 1990 February 16 |
Box 4 | Folder 380 | Fifth level, tower crane opening in-fill | 1990 February 16 |
Box 4 | Folder 381 | Sixth level, south | 1990 February 16 |
Box 4 | Folder 382 | Sixth level, north west corner | 1990 February 16 |
Box 4 | Folder 383 | Seventh level, north wall CMU back-up | 1990 February 16 |
Box 4 | Folder 384 | Seventh level, north east corner | 1990 February 16 |
Box 4 | Folder 385 | Seventh level, east perimeter | 1990 February 16 |
Box 4 | Folder 386 | Eighth level, north east | 1990 February 16 |
Box 4 | Folder 387 | Eighth level, tower crane opening in-fill | 1990 February 16 |
Box 4 | Folder 388 | Ninth level, structural steel derrick | 1990 February 16 |
Box 4 | Folder 389 | Ninth level, elevator core | 1990 February 16 |
Box 4 | Folder 390 | Ninth level, structural steel anchor bolts | 1990 February 16 |
Box 4 | Folder 391 | Ninth level, north | 1990 February 16 |
Box 4 | Folder 392 | Ninth level, south | 1990 February 16 |
Box 4 | Folder 393 | Ninth level, north east corner, steel erection | 1990 February 28 |
Box 4 | Folder 394 | Ninth level, looking north | 1990 February 28 |
Box 4 | Folder 395 | Ninth level, derrick mtr. Shanty | 1990 February 28 |
Box 4 | Folder 396 | Eighth level, electrical layout | 1990 February 28 |
Box 4 | Folder 397 | Seventh level, out-rigger erection | 1990 February 28 |
Box 4 | Folder 398 | Seventh level, north CMU wall | 1990 February 28 |
Box 4 | Folder 399 | Sixth level, HVAL duct installation | 1990 February 28 |
Box 4 | Folder 400 | Sixth and seventh levels, stair installation | 1990 February 28 |
Box 5 | Folder 401 | Fifth level, plumbing | 1990 February 28 |
Box 5 | Folder 402 | Fifth level, sprinkler header | 1990 February 28 |
Box 5 | Folder 403 | Fifth level, looking south | 1990 February 28 |
Box 5 | Folder 404 | Fourth level, north east | 1990 February 28 |
Box 5 | Folder 405 | Fourth level, south east stair installation | 1990 February 28 |
Box 5 | Folder 406 | Fourth level, west, drywall layout | 1990 February 28 |
Box 5 | Folder 407 | Third level, HVAC duct insulation | 1990 February 28 |
Box 5 | Folder 408 | Third level, east external wall insulation | 1990 February 28 |
Box 5 | Folder 409 | Second level, south west pt cap | 1990 February 28 |
Box 5 | Folder 410 | Lower level, south west, mechanical room pad layout | 1990 February 28 |
Box 5 | Folder 411 | Lower level, south raker closer | 1990 February 28 |
Box 5 | Folder 412 | Lower level, north, auditorium, CMU wall | 1990 February 28 |
Box 5 | Folder 413 | Lower level, north west, mechanical room pad layout | 1990 February 28 |
Box 5 | Folder 414 | Lower level, pipe installation | 1990 February 28 |
Box 5 | Folder 415 | Ground level, north, auditorium CMU wall | 1990 February 28 |
Box 5 | Folder 416 | Ground level, auditorium wire nest | 1990 February 28 |
Box 5 | Folder 417 | North elevation | 1990 February 28 |
Box 5 | Folder 418 | North half | 1990 February 28 |
Box 5 | Folder 419 | South half | 1990 February 28 |
Box 5 | Folder 420 | South elevation | 1990 February 28 |
Box 5 | Folder 421 | South east corner | 1990 February 28 |
Box 5 | Folder 422 | East elevation | 1990 February 28 |
Box 5 | Folder 423 | Lower level, raker removal, north west corner | 1990 March 15 |
Box 5 | Folder 424 | CMU walls | 1990 March 15 |
Box 5 | Folder 425 | Lower level, escalators | 1990 March 15 |
Box 5 | Folder 426 | Lower level, box cut for future subway | 1990 March 15 |
Box 5 | Folder 427 | Lower level, chiller installation | 1990 March 15 |
Box 5 | Folder 428 | Ground level, escalator at mezzanine landing | 1990 March 15 |
Box 5 | Folder 429 | Ground level, chiller access opening | 1990 March 15 |
Box 5 | Folder 430 | Ground level, CMU wall stairway | 1990 March 15 |
Box 5 | Folder 431 | Second level, escalator | 1990 March 15 |
Box 5 | Folder 432 | Second level, complex lobby | 1990 March 15 |
Box 5 | Folder 433 | Third level, stair # 2 installation | 1990 March 15 |
Box 5 | Folder 434 | Third level, exterior brick, north elevation | 1990 March 15 |
Box 5 | Folder 435 | Third level, exterior brick, north west corner | 1990 March 15 |
Box 5 | Folder 436 | Fourth level, wall layout | 1990 March 15 |
Box 5 | Folder 437 | Fourth level, HVAC installation | 1990 March 15 |
Box 5 | Folder 438 | Fifth level, looking north | 1990 March 15 |
Box 5 | Folder 439 | Fifth level, stair installation | 1990 March 15 |
Box 5 | Folder 440 | Sixth level, view of Plymouth Court | 1990 March 15 |
Box 5 | Folder 441 | Sixth level, looking north | 1990 March 15 |
Box 5 | Folder 442 | Seventh level, south perimeter | 1990 March 15 |
Box 5 | Folder 443 | Seventh level, escalator opening | 1990 March 15 |
Box 5 | Folder 444 | Eighth level, under floor ducts | 1990 March 15 |
Box 5 | Folder 445 | Eighth level, looking south | 1990 March 15 |
Box 5 | Folder 446 | Eighth level, topping slab formwork | 1990 March 15 |
Box 5 | Folder 447 | Ninth level, freight elevator | 1990 March 15 |
Box 5 | Folder 448 | Ninth level, structural steel | 1990 March 15 |
Box 5 | Folder 449 | Ninth level, cooling tower support framing | 1990 March 15 |
Box 5 | Folder 450 | Ninth level, north corridor | 1990 March 15 |
Box 5 | Folder 451 | Ninth level, north, restaurant | 1990 March 15 |
Box 5 | Folder 452 | Backfill, north elevation | 1990 March 15 |
Box 5 | Folder 453 | G.V., looking south east | 1990 March 30 |
Box 5 | Folder 454 | G.V., looking south | 1990 March 30 |
Box 5 | Folder 455 | West elevation | 1990 March 30 |
Box 5 | Folder 456 | South west corner | 1990 March 30 |
Box 5 | Folder 457 | South east corner | 1990 March 30 |
Box 5 | Folder 458 | Looking north | 1990 March 30 |
Box 5 | Folder 459 | Auditorium slab | 1990 March 30 |
Box 5 | Folder 460 | Lower level, CMU wall | 1990 March 30 |
Box 5 | Folder 461 | Lower level, electrical rough-in | 1990 March 30 |
Box 5 | Folder 462 | Lower level, south mechanical room | 1990 March 30 |
Box 5 | Folder 463 | West elevation, curtain wall framing | 1990 March 30 |
Box 5 | Folder 464 | Elevator equipment | 1990 March 30 |
Box 5 | Folder 465 | Ground level, south east corner | 1990 March 30 |
Box 5 | Folder 466 | Ground level, view from main entry | 1990 March 30 |
Box 5 | Folder 467 | Second level, metal studs, south west corner | 1990 March 30 |
Box 5 | Folder 468 | Second level, metal studs, looking north | 1990 March 30 |
Box 5 | Folder 469 | Second level, Ceco vault room | 1990 March 30 |
Box 5 | Folder 470 | Third level, stock drywall | 1990 March 30 |
Box 5 | Folder 471 | Third level, stairway cleanup | 1990 March 30 |
Box 5 | Folder 472 | Third level, escalator unit staging | 1990 March 30 |
Box 5 | Folder 473 | Fourth level, looking south | 1990 March 30 |
Box 5 | Folder 474 | West, cast stone, north elevation | 1990 March 30 |
Box 5 | Folder 475 | Shelf angle, north elevation | 1990 March 30 |
Box 5 | Folder 476 | Fifth level, looking south | 1990 March 30 |
Box 5 | Folder 477 | Fifth level, south escalator tower | 1990 March 30 |
Box 5 | Folder 478 | Sixth level, looking north | 1990 March 30 |
Box 5 | Folder 479 | Seventh level, ductwork installation | 1990 March 30 |
Box 5 | Folder 480 | Seventh level, plumbing installation | 1990 March 30 |
Box 5 | Folder 481 | Seventh level, escalator support frame | 1990 March 30 |
Box 5 | Folder 482 | Eighth level, looking south | 1990 March 30 |
Box 5 | Folder 483 | Cooling tower | 1990 March 30 |
Box 5 | Folder 484 | Ninth level, structural steel | 1990 March 30 |
Box 5 | Folder 485 | Ninth level, looking north | 1990 March 30 |
Box 5 | Folder 486 | Freight elevator shaft | 1990 March 30 |
Box 5 | Folder 487 | North west elevation | 1990 March 30 |
Box 5 | Folder 488 | North half | 1990 March 30 |
Box 5 | Folder 489 | South half | 1990 March 30 |
Box 5 | Folder 490 | Auditorium slab pour | 1990 March 30 |
Box 5 | Folder 491 | Lower level, CMU walls at stair | 1990 April 12 |
Box 5 | Folder 492 | Lower level, CMU walls | 1990 April 12 |
Box 5 | Folder 493 | Lower level, ductwork insulation | 1990 April 12 |
Box 5 | Folder 494 | Lower level, south east, mechanical room | 1990 April 12 |
Box 5 | Folder 495 | Lower level, view of auditorium slab | 1990 April 12 |
Box 5 | Folder 496 | Ground level, parking deck water test | 1990 April 12 |
Box 5 | Folder 497 | Ground level, lobby, looking south | 1990 April 12 |
Box 5 | Folder 498 | Second level, escalator | 1990 April 12 |
Box 5 | Folder 499 | Second level, south east corner | 1990 April 12 |
Box 5 | Folder 500 | Second level, ceiling mock-up | 1990 April 12 |
Box 6 | Folder 501 | Third level, exterior wall insulation | 1990 April 12 |
Box 6 | Folder 502 | Third level, escalator tower, south | 1990 April 12 |
Box 6 | Folder 503 | Third level, escalator tower, north | 1990 April 12 |
Box 6 | Folder 504 | Fourth level, north west corner | 1990 April 12 |
Box 6 | Folder 505 | Fourth level, escalator support framing | 1990 April 12 |
Box 6 | Folder 506 | Fourth level, east wall | 1990 April 12 |
Box 6 | Folder 507 | Fifth level, east wall | 1990 April 12 |
Box 6 | Folder 508 | Fifth level, escalator, south | 1990 April 12 |
Box 6 | Folder 509 | Sixth level, duct installation | 1990 April 12 |
Box 6 | Folder 510 | Sixth level, looking north | 1990 April 12 |
Box 6 | Folder 511 | Sixth level, curtain wall framing | 1990 April 12 |
Box 6 | Folder 512 | Seventh level, looking north | 1990 April 12 |
Box 6 | Folder 513 | Eighth level, north end | 1990 April 12 |
Box 6 | Folder 514 | Eighth level, looking south | 1990 April 12 |
Box 6 | Folder 515 | Ninth level, north east, mechanical room | 1990 April 12 |
Box 6 | Folder 516 | Ninth level, looking south | 1990 April 12 |
Box 6 | Folder 517 | Elevator core | 1990 April 12 |
Box 6 | Folder 518 | Derrick setup | 1990 April 12 |
Box 6 | Folder 519 | Structural steel, looking north | 1990 April 12 |
Box 6 | Folder 520 | Ninth level, west perimeter | 1990 April 12 |
Box 6 | Folder 521 | Tenth level, looking east | 1990 April 12 |
Box 6 | Folder 522 | Tenth level, north east corner | 1990 April 12 |
Box 6 | Folder 523 | Tenth level, north west, mechanical room | 1990 April 12 |
Box 6 | Folder 524 | Tenth level, north wall | 1990 April 12 |
Box 6 | Folder 525 | North east, low roof | 1990 April 12 |
Box 6 | Folder 526 | South east corner | 1990 April 26 |
Box 6 | Folder 527 | South elevation | 1990 April 26 |
Box 6 | Folder 528 | East elevation | 1990 April 26 |
Box 6 | Folder 529 | North elevation | 1990 April 26 |
Box 6 | Folder 530 | Lower level, shop room | 1990 April 26 |
Box 6 | Folder 531 | Lower level, hyp. Elevation piston shaft | 1990 April 26 |
Box 6 | Folder 532 | Lower level, chiller pip | 1990 April 26 |
Box 6 | Folder 533 | Ground level, auditorium floor | 1990 April 26 |
Box 6 | Folder 534 | Ground level, north parking area | 1990 April 26 |
Box 6 | Folder 535 | Second level, north mechanical ext. vnt | 1990 April 26 |
Box 6 | Folder 536 | Second level, west mezzanine | 1990 April 26 |
Box 6 | Folder 537 | South elevation, concrete damp-proofing | 1990 April 26 |
Box 6 | Folder 538 | Third level, arch window sill damp-proof | 1990 April 26 |
Box 6 | Folder 539 | Third level, Ceco closet stairs, south east | 1990 April 26 |
Box 6 | Folder 540 | Third level, looking north | 1990 April 26 |
Box 6 | Folder 541 | Fourth level, looking north | 1990 April 26 |
Box 6 | Folder 542 | Fourth level, north elevation arch window angle | 1990 April 26 |
Box 6 | Folder 543 | Fourth level, north elevation, brick work | 1990 April 26 |
Box 6 | Folder 544 | Fifth level, looking north | 1990 April 26 |
Box 6 | Folder 545 | Fifth level, looking south west | 1990 April 26 |
Box 6 | Folder 546 | Sixth partition layout crew | 1990 April 26 |
Box 6 | Folder 547 | Sixth level, in-fill slab finisher | 1990 April 26 |
Box 6 | Folder 548 | Sixth level, electrical rough-in | 1990 April 26 |
Box 6 | Folder 549 | Seventh level, looking north | 1990 April 26 |
Box 6 | Folder 550 | Seventh level, electrical rough-in | 1990 April 26 |
Box 6 | Folder 551 | Eighth level, sprinkler rough-in | 1990 April 26 |
Box 6 | Folder 552 | Eighth level, looking south east | 1990 April 26 |
Box 6 | Folder 553 | Eighth level, north west corner, storm drain | 1990 April 26 |
Box 6 | Folder 554 | Ninth level, steel erection | 1990 April 26 |
Box 6 | Folder 555 | Ninth level, Winter Garden, looking south | 1990 April 26 |
Box 6 | Folder 556 | Ninth level, looking at south east corner | 1990 April 26 |
Box 6 | Folder 557 | Dividing beam installation pass elevation | 1990 April 26 |
Box 6 | Folder 558 | Tenth level, looking south east | 1990 April 26 |
Box 6 | Folder 559 | Tenth level, walker duct installation | 1990 April 26 |
Box 6 | Folder 560 | North east, low roof, looking west | 1990 April 26 |
Box 6 | Folder 561 | Winter Garden from bridge | 1990 April 26 |
Box 6 | Folder 562 | Eleventh level, looking at south east corner | 1990 April 26 |
Box 6 | Folder 563 | North half | 1990 April 26 |
Box 6 | Folder 564 | South half | 1990 April 26 |
Box 6 | Folder 565 | Tenth level, looking north across Winter Garden | 1990 May 15 |
Box 6 | Folder 566 | Tenth level, looking south west corner | 1990 May 15 |
Box 6 | Folder 567 | Eleventh level, looking south west corner | 1990 May 15 |
Box 6 | Folder 568 | Tenth level, looking south | 1990 May 15 |
Box 6 | Folder 569 | Tenth level, looking north east corner | 1990 May 15 |
Box 6 | Folder 570 | North elevator dividing beam | 1990 May 15 |
Box 6 | Folder 571 | Ninth level, east, brick scaffold beams | 1990 May 15 |
Box 6 | Folder 572 | Ninth level, south west corner, looking north | 1990 May 15 |
Box 6 | Folder 573 | Ninth level, looking north | 1990 May 15 |
Box 6 | Folder 574 | Eighth level, chilled water piping | 1990 May 15 |
Box 6 | Folder 575 | Eighth level, escalators | 1990 May 15 |
Box 6 | Folder 576 | Eighth level, view south | 1990 May 15 |
Box 6 | Folder 577 | Seventh level, north east plumb chase | 1990 May 15 |
Box 6 | Folder 578 | Seventh level, looking north west | 1990 May 15 |
Box 6 | Folder 579 | Sixth level, ceiling electric | 1990 May 15 |
Box 6 | Folder 580 | Sixth level, looking north west corner | 1990 May 15 |
Box 6 | Folder 581 | Fifth level, north brick | 1990 May 15 |
Box 6 | Folder 582 | Fifth level, looking north | 1990 May 15 |
Box 6 | Folder 583 | Fourth level, view north west | 1990 May 15 |
Box 6 | Folder 584 | Fourth level, ceiling electric | 1990 May 15 |
Box 6 | Folder 585 | Fourth level, ductwork | 1990 May 15 |
Box 6 | Folder 586 | Third level, curtain wall erection | 1990 May 15 |
Box 6 | Folder 587 | Third level, view looking west | 1990 May 15 |
Box 6 | Folder 588 | Third level, brick at window | 1990 May 15 |
Box 6 | Folder 589 | Second level, setting door frames | 1990 May 15 |
Box 6 | Folder 590 | Second level, view north west | 1990 May 15 |
Box 6 | Folder 591 | Ground level, down to chiller room | 1990 May 15 |
Box 6 | Folder 592 | Mezzanine, escalators and pool | 1990 May 15 |
Box 6 | Folder 593 | Ground level, auditorium | 1990 May 15 |
Box 6 | Folder 594 | Ground level, west elevation | 1990 May 15 |
Box 6 | Folder 595 | Lower level, interior masonry | 1990 May 15 |
Box 6 | Folder 596 | Lower level, masonry | 1990 May 15 |
Box 6 | Folder 597 | Lower level, north west from fan room | 1990 May 15 |
Box 6 | Folder 598 | South east corner | 1990 May 30 |
Box 6 | Folder 599 | East elevation | 1990 May 30 |
Box 6 | Folder 600 | West elevation | 1990 May 30 |
Box 7 | Folder 601 | Lower level, looking south east | 1990 May 30 |
Box 7 | Folder 602 | Chiller room, south end | 1990 May 30 |
Box 7 | Folder 603 | Lower level, masonry in progress | 1990 May 30 |
Box 7 | Folder 604 | Ground level, masonry and electrical service | 1990 May 30 |
Box 7 | Folder 605 | Mezzanine level, looking east | 1990 May 30 |
Box 7 | Folder 606 | Second level, finish plaster | 1990 May 30 |
Box 7 | Folder 607 | Second level, escalators | 1990 May 30 |
Box 7 | Folder 608 | Second level, metal studs/gypsum board | 1990 May 30 |
Box 7 | Folder 609 | Third level, view looking north west corner | 1990 May 30 |
Box 7 | Folder 610 | Third level, view along east interior | 1990 May 30 |
Box 7 | Folder 611 | Third level, terrazzo preparation | 1990 May 30 |
Box 7 | Folder 612 | Fourth level, east perimeter alcoves | 1990 May 30 |
Box 7 | Folder 613 | Fourth level, ceiling grid | 1990 May 30 |
Box 7 | Folder 614 | Fourth level, east | 1990 May 30 |
Box 7 | Folder 615 | Fifth level, partition layout, south | 1990 May 30 |
Box 7 | Folder 616 | Fifth level, view west | 1990 May 30 |
Box 7 | Folder 617 | Sixth level, north brick | 1990 May 30 |
Box 7 | Folder 618 | Sixth level, masonry flashing | 1990 May 30 |
Box 7 | Folder 619 | Sixth level, north masonry shelf angles | 1990 May 30 |
Box 7 | Folder 620 | Seventh level, door frames | 1990 May 30 |
Box 7 | Folder 621 | Seventh level, ceiling ductwork | 1990 May 30 |
Box 7 | Folder 622 | Eighth level, ceiling ductwork | 1990 May 30 |
Box 7 | Folder 623 | Eighth level, view south | 1990 May 30 |
Box 7 | Folder 624 | Eighth level, electrical RI | 1990 May 30 |
Box 7 | Folder 625 | Ninth level, masonry, north east corner | 1990 May 30 |
Box 7 | Folder 626 | Ninth level, barrel vaults | 1990 May 30 |
Box 7 | Folder 627 | Ninth level, looking south east corner | 1990 May 30 |
Box 7 | Folder 628 | Tenth level, looking west | 1990 May 30 |
Box 7 | Folder 629 | Tenth level, concrete, north west | 1990 May 30 |
Box 7 | Folder 630 | Low roof, north east corner | 1990 May 30 |
Box 7 | Folder 631 | North elevation | 1990 May 30 |
Box 7 | Folder 632 | Roof, north half | 1990 May 30 |
Box 7 | Folder 633 | Roof, south half | 1990 May 30 |
Box 7 | Folder 634 | Tenth level, south between C-D line | 1990 June 14 |
Box 7 | Folder 635 | Tenth level, south between H-S line | 1990 June 14 |
Box 7 | Folder 636 | Ninth level, south west corner | 1990 June 14 |
Box 7 | Folder 637 | Ninth level, looking south east from south west corner | 1990 June 14 |
Box 7 | Folder 638 | Ninth level, looking east between line 4-5 | 1990 June 14 |
Box 7 | Folder 639 | Ninth level, looking south east | 1990 June 14 |
Box 7 | Folder 640 | Ninth level, looking north east | 1990 June 14 |
Box 7 | Folder 641 | Seventh level, set-up spider at elevator shaft | 1990 June 14 |
Box 7 | Folder 642 | Seventh level, north, HVAC above ceiling | 1990 June 14 |
Box 7 | Folder 643 | Sixth level, patching architectural columns | 1990 June 14 |
Box 7 | Folder 644 | Sixth level, west, mullions | 1990 June 14 |
Box 7 | Folder 645 | Fifth level, south, stud wall construction | 1990 June 14 |
Box 7 | Folder 646 | Fifth level, south east, layout electric room | 1990 June 14 |
Box 7 | Folder 647 | Fifth level, bending conduit | 1990 June 14 |
Box 7 | Folder 648 | Fourth level, insulating ductwork | 1990 June 14 |
Box 7 | Folder 649 | Fourth level, north, ceiling band suspension | 1990 June 14 |
Box 7 | Folder 650 | Fourth level, south, ceiling bands | 1990 June 14 |
Box 7 | Folder 651 | Third level, west side, chilled H2O lines | 1990 June 14 |
Box 7 | Folder 652 | Third level, fabricating valve connection | 1990 June 14 |
Box 7 | Folder 653 | Third level, south, electric room | 1990 June 14 |
Box 7 | Folder 654 | Third level, drywall partition | 1990 June 14 |
Box 7 | Folder 655 | Fourth level, south, alcove forming | 1990 June 14 |
Box 7 | Folder 656 | Second level, ceiling bands | 1990 June 14 |
Box 7 | Folder 657 | Second level, south stair well construction | 1990 June 14 |
Box 7 | Folder 658 | Ground level, entry, stone mock-up | 1990 June 14 |
Box 7 | Folder 659 | Ground level, northwest corner elevation, stone installation | 1990 June 14 |
Box 7 | Folder 660 | Lower level, north west fan room, ductwork | 1990 June 14 |
Box 7 | Folder 661 | Lower level, west toilet room | 1990 June 14 |
Box 7 | Folder 662 | Tenth level, 18” condensation pipe | 1990 June 27 |
Box 7 | Folder 663 | Eleventh level, north east, roofing | 1990 June 27 |
Box 7 | Folder 664 | Ninth level, Winter Garden roof | 1990 June 27 |
Box 7 | Folder 665 | Eleventh level, Winter Garden | 1990 June 27 |
Box 7 | Folder 666 | Roof, barrel roll section | 1990 June 27 |
Box 7 | Folder 667 | Roofing insulation | 1990 June 27 |
Box 7 | Folder 668 | Sky light framing | 1990 June 27 |
Box 7 | Folder 669 | Tenth level, metal decking wire mesh | 1990 June 27 |
Box 7 | Folder 670 | Ninth level, south west corner, under floor duct | 1990 June 27 |
Box 7 | Folder 671 | Eighth level, FP standpipe riser at stair | 1990 June 27 |
Box 7 | Folder 672 | Eighth level, tie-in drain for Winter Garden | 1990 June 27 |
Box 7 | Folder 673 | Eighth level, south west corner, supp. air duct riser | 1990 June 27 |
Box 7 | Folder 674 | Eighth level, duct installation | 1990 June 27 |
Box 7 | Folder 675 | Seventh level, swing stage brace | 1990 June 27 |
Box 7 | Folder 676 | Seventh level, WD brace for door frame | 1990 June 27 |
Box 7 | Folder 677 | Seventh level, north, cutting stone | 1990 June 27 |
Box 7 | Folder 678 | Seventh level, bar clamps for precast stone | 1990 June 27 |
Box 7 | Folder 679 | Seventh level, bar clamps for precast stone | 1990 June 27 |
Box 7 | Folder 680 | Sixth level, reading room, drywall ferring channels | 1990 June 27 |
Box 7 | Folder 681 | Fifth level, duct installation | 1990 June 27 |
Box 7 | Folder 682 | Fifth level, reading room, drywall | 1990 June 27 |
Box 7 | Folder 683 | Fifth level, south corridor, metal studs | 1990 June 27 |
Box 7 | Folder 684 | Fourth level, periodicals service center, drywall | 1990 June 27 |
Box 7 | Folder 685 | Fourth level, horizontal drywall | 1990 June 27 |
Box 7 | Folder 686 | Third level, terrazzo | 1990 June 27 |
Box 7 | Folder 687 | Second level, backside | 1990 June 27 |
Box 7 | Folder 688 | Ground level, block walls installation | 1990 June 27 |
Box 7 | Folder 689 | Lower level, south east corner, fan room housing | 1990 June 27 |
Box 7 | Folder 690 | Lower level, heat exchange rough-in | 1990 June 27 |
Box 7 | Folder 691 | West elevation | 1990 June 27 |
Box 7 | Folder 692 | North half | 1990 June 27 |
Box 7 | Folder 693 | South half | 1990 June 27 |
Box 7 | Folder 694 | East elevation | 1990 June 27 |
Box 7 | Folder 695 | Looking north west | 1990 June 27 |
Box 7 | Folder 696 | North elevation, looking south | 1990 June 27 |
Box 7 | Folder 697 | Lower level, north west corner, fan room | 1990 July 12 |
Box 7 | Folder 698 | Lower level, chiller room | 1990 July 12 |
Box 7 | Folder 699 | Lower level, multipurpose room | 1990 July 12 |
Box 7 | Folder 700 | Ground level, looking down into auditorium | 1990 July 12 |
Box 8 | Folder 701 | North west corner, granite | 1990 July 12 |
Box 8 | Folder 702 | North entrance, setting granite | 1990 July 12 |
Box 8 | Folder 703 | North east corner, setting display window | 1990 July 12 |
Box 8 | Folder 704 | Second level, west, corridor drywall | 1990 July 12 |
Box 8 | Folder 705 | Second level, escalator, setting steps | 1990 July 12 |
Box 8 | Folder 706 | Third level, terrazzo layout | 1990 July 12 |
Box 8 | Folder 707 | Third level, escalator | 1990 July 12 |
Box 8 | Folder 708 | Fourth level, alcove | 1990 July 12 |
Box 8 | Folder 709 | Fourth level, masonry | 1990 July 12 |
Box 8 | Folder 710 | Fourth level, east perimeter drywall | 1990 July 12 |
Box 8 | Folder 711 | Fifth level, looking north | 1990 July 12 |
Box 8 | Folder 712 | Fifth level, pipe insulation | 1990 July 12 |
Box 8 | Folder 713 | Fifth level, west perimeter wall | 1990 July 12 |
Box 8 | Folder 714 | Sixth level, west curtain wall | 1990 July 12 |
Box 8 | Folder 715 | Sixth level, alcove rough-in | 1990 July 12 |
Box 8 | Folder 716 | Seventh level, brick arch form | 1990 July 12 |
Box 8 | Folder 717 | Eighth level, concrete clean up | 1990 July 12 |
Box 8 | Folder 718 | Festoon close-up | 1990 July 12 |
Box 8 | Folder 719 | Ninth level, north east corner, mechanical room | 1990 July 12 |
Box 8 | Folder 720 | Ninth level, south east corner, duct | 1990 July 12 |
Box 8 | Folder 721 | Tenth level, looking down, Winter Garden framing | 1990 July 12 |
Box 8 | Folder 722 | Tenth level, concrete | 1990 July 12 |
Box 8 | Folder 723 | Tenth level, bridge looking west | 1990 July 12 |
Box 8 | Folder 724 | Sky light, north west corner, framing | 1990 July 12 |
Box 8 | Folder 725 | Tenth level, elevator landing framing | 1990 July 12 |
Box 8 | Folder 726 | Eleventh level, machine room | 1990 July 12 |
Box 8 | Folder 727 | Eleventh level, looking east across Winter Garden | 1990 July 12 |
Box 8 | Folder 728 | Sky light framing | 1990 July 12 |
Box 8 | Folder 729 | Tenth level, chiller | 1990 July 12 |
Box 8 | Folder 730 | South east corner, elevation | 1990 July 26 |
Box 8 | Folder 731 | Setting display window granite | 1990 July 26 |
Box 8 | Folder 732 | Curtain wall glazing | 1990 July 26 |
Box 8 | Folder 733 | Lower level, studwork | 1990 July 26 |
Box 8 | Folder 734 | Chiller supp. /ret | 1990 July 26 |
Box 8 | Folder 735 | Lower level, lobby enclosure | 1990 July 26 |
Box 8 | Folder 736 | Display window with granite | 1990 July 26 |
Box 8 | Folder 737 | Ground level, looking down into auditorium | 1990 July 26 |
Box 8 | Folder 738 | Ground level | 1990 July 26 |
Box 8 | Folder 739 | South elevation, elevator scaffolding | 1990 July 26 |
Box 8 | Folder 740 | Escalator power wire | 1990 July 26 |
Box 8 | Folder 741 | Third level, plaster | 1990 July 26 |
Box 8 | Folder 742 | Third level, terrazzo | 1990 July 26 |
Box 8 | Folder 743 | Terrazzo work | 1990 July 26 |
Box 8 | Folder 744 | Third level, drywall | 1990 July 26 |
Box 8 | Folder 745 | Fourth level, alcove | 1990 July 26 |
Box 8 | Folder 746 | Fourth level, ceiling | 1990 July 26 |
Box 8 | Folder 747 | Fifth level, rock lath | 1990 July 26 |
Box 8 | Folder 748 | Fifth level, partition frame | 1990 July 26 |
Box 8 | Folder 749 | Fifth level, curtain glaze | 1990 July 26 |
Box 8 | Folder 750 | Sixth level, looking north | 1990 July 26 |
Box 8 | Folder 751 | Sixth level, rock lath | 1990 July 26 |
Box 8 | Folder 752 | Seventh level, masonry | 1990 July 26 |
Box 8 | Folder 753 | Seventh level, arches interior | 1990 July 26 |
Box 8 | Folder 754 | Seventh level, partition work | 1990 July 26 |
Box 8 | Folder 755 | Tenth level, looking over Winter Garden sky light glazing | 1990 July 26 |
Box 8 | Folder 756 | Eleventh level, looking over Winter Garden | 1990 July 26 |
Box 8 | Folder 757 | Lower roof, north east corner | 1990 July 26 |
Box 8 | Folder 758 | East elevation | 1990 July 26 |
Box 8 | Folder 759 | West elevation | 1990 July 26 |
Box 8 | Folder 760 | North west corner, elevation | 1990 July 26 |
Box 8 | Folder 761 | Roof, north half | 1990 July 26 |
Box 8 | Folder 762 | Roof, south half | 1990 July 26 |
Box 8 | Folder 763 | Missing | |
Box 8 | Folder 764 | Missing | |
Box 8 | Folder 765 | Ground level, Congress Corridor, interior | 1990 August 16 |
Box 8 | Folder 766 | Ground level, drywall partitions | 1990 August 16 |
Box 8 | Folder 767 | Second level, partition work | 1990 August 16 |
Box 8 | Folder 768 | Second level, bathroom tile | 1990 August 16 |
Box 8 | Folder 769 | Setting elevator sill angle | 1990 August 16 |
Box 8 | Folder 770 | Third level, north corridor, plaster work | 1990 August 16 |
Box 8 | Folder 771 | Third level, ceiling grid | 1990 August 16 |
Box 8 | Folder 772 | Third level, terrazzo bed | 1990 August 16 |
Box 8 | Folder 773 | Second level, terrazzo | 1990 August 16 |
Box 8 | Folder 774 | Third level, south elevation, brick | 1990 August 16 |
Box 8 | Folder 775 | Third level, plaster partitions | 1990 August 16 |
Box 8 | Folder 776 | Fifth level, north west corner | 1990 August 16 |
Box 8 | Folder 777 | Fifth level, alcove ceiling | 1990 August 16 |
Box 8 | Folder 778 | Fifth level, terrazzo base | 1990 August 16 |
Box 8 | Folder 779 | East elevation, brick and precast stone | 1990 August 16 |
Box 8 | Folder 780 | Seventh level, west corridor | 1990 August 16 |
Box 8 | Folder 781 | North masonry arches | 1990 August 16 |
Box 8 | Folder 782 | Festoons on exterior north wall | 1990 August 16 |
Box 8 | Folder 783 | Ninth level, spray fire-proofing steel | 1990 August 16 |
Box 8 | Folder 784 | Ninth level, north west corner, fan room | 1990 August 16 |
Box 8 | Folder 785 | Tenth level, looking south over Winter Garden | 1990 August 16 |
Box 8 | Folder 786 | Roof gutter, north west corner | 1990 August 16 |
Box 8 | Folder 787 | Sky light, looking west | 1990 August 16 |
Box 8 | Folder 788 | Elevator machine room masonry | 1990 August 16 |
Box 8 | Folder 789 | Eleventh level, masonry | 1990 August 16 |
Box 8 | Folder 790 | Roof corner framing | 1990 August 16 |
Box 8 | Folder 791 | West pediment wall erection | 1990 August 16 |
Box 8 | Folder 792 | Sixth level, ceiling grid | 1990 August 16 |
Box 8 | Folder 793 | Fourth level, bathroom waterproofing | 1990 August 16 |
Box 8 | Folder 794 | Second level, ceiling scaffold | 1990 August 16 |
Box 8 | Folder 795 | North west corner, elevation, granite erection | 1990 August 16 |
Box 8 | Folder 796 | South east corner, elevation | 1990 August 16 |
Box 8 | Folder 797 | North elevation | 1990 August 30 |
Box 8 | Folder 798 | West elevation | 1990 August 30 |
Box 8 | Folder 799 | East elevation | 1990 August 30 |
Box 8 | Folder 800 | South east corner, elevation | 1990 August 30 |
Box 9 | Folder 801 | Lower level, corridor | 1990 August 30 |
Box 9 | Folder 802 | Lower level, mechanical insulation | 1990 August 30 |
Box 9 | Folder 803 | Lower level, mechanical/chiller room | 1990 August 30 |
Box 9 | Folder 804 | Ground level, drywall finish | 1990 August 30 |
Box 9 | Folder 805 | Ground level, State Street entrance | 1990 August 30 |
Box 9 | Folder 806 | Lower level, auditorium ceiling scaffolding | 1990 August 30 |
Box 9 | Folder 807 | Second level, corridor ceiling layout | 1990 August 30 |
Box 9 | Folder 808 | Main lobby ceiling | 1990 August 30 |
Box 9 | Folder 809 | Second level, ceiling finish | 1990 August 30 |
Box 9 | Folder 810 | Third level, looking north | 1990 August 30 |
Box 9 | Folder 811 | Third level, elevator lobby | 1990 August 30 |
Box 9 | Folder 812 | Third level, bathroom tile | 1990 August 30 |
Box 9 | Folder 813 | Fourth level, partitions | 1990 August 30 |
Box 9 | Folder 814 | Fourth level, north corridor | 1990 August 30 |
Box 9 | Folder 815 | Fifth level, plaster work | 1990 August 30 |
Box 9 | Folder 816 | Fifth level, looking north | 1990 August 30 |
Box 9 | Folder 817 | Fifth level, precast stone | 1990 August 30 |
Box 9 | Folder 818 | Sixth level, east corridor ceiling | 1990 August 30 |
Box 9 | Folder 819 | Sixth level, alcove precast ceiling | 1990 August 30 |
Box 9 | Folder 820 | North wall exterior, festoon inspection | 1990 August 30 |
Box 9 | Folder 821 | North east corner, brick arcass | 1990 August 30 |
Box 9 | Folder 822 | West wall, sleeve in brick area | 1990 August 30 |
Box 9 | Folder 823 | Eighth level, looking south | 1990 August 30 |
Box 9 | Folder 824 | Eighth level, electrical ceiling rough-in | 1990 August 30 |
Box 9 | Folder 825 | Ninth level, looking north up to sky light | 1990 August 30 |
Box 9 | Folder 826 | Eleventh level, masonry | 1990 August 30 |
Box 9 | Folder 827 | Cutter framing, south east corner | 1990 August 30 |
Box 9 | Folder 828 | North half | 1990 August 30 |
Box 9 | Folder 829 | South half | 1990 August 30 |
Box 9 | Folder 830 | South west corner, elevation | 1990 August 30 |
Box 9 | Folder 831 | Lower level, north east corner, fan room | 1990 September 13 |
Box 9 | Folder 832 | Lower level, main lobby | 1990 September 13 |
Box 9 | Folder 833 | Lower level, switch gear room | 1990 September 13 |
Box 9 | Folder 834 | Ground level, main entrance | 1990 September 13 |
Box 9 | Folder 835 | Ground level, auditorium | 1990 September 13 |
Box 9 | Folder 836 | Mezzanine | 1990 September 13 |
Box 9 | Folder 837 | Second level, Children’s Library | 1990 September 13 |
Box 9 | Folder 838 | Second level, corridor | 1990 September 13 |
Box 9 | Folder 839 | Third level, looking south | 1990 September 13 |
Box 9 | Folder 840 | Third level, escalator enclosure | 1990 September 13 |
Box 9 | Folder 841 | Third level, ceiling | 1990 September 13 |
Box 9 | Folder 842 | Fourth level, south corridor | 1990 September 13 |
Box 9 | Folder 843 | Fourth level, alcove plaster | 1990 September 13 |
Box 9 | Folder 844 | Fourth level, clear story alcove | 1990 September 13 |
Box 9 | Folder 845 | Fifth level, looking north west | 1990 September 13 |
Box 9 | Folder 846 | Fifth level, terrazzo corridor | 1990 September 13 |
Box 9 | Folder 847 | Fifth level, south wall, precast stone installation | 1990 September 13 |
Box 9 | Folder 848 | Sixth level, plaster walls | 1990 September 13 |
Box 9 | Folder 849 | Sixth level, escalator rails | 1990 September 13 |
Box 9 | Folder 850 | Seventh level, masonry arches | 1990 September 13 |
Box 9 | Folder 851 | Seventh level, partitions | 1990 September 13 |
Box 9 | Folder 852 | Eighth level, looking at south east corner | 1990 September 13 |
Box 9 | Folder 853 | East elevation, festoons | 1990 September 13 |
Box 9 | Folder 854 | Ninth level, mechanical R-I | 1990 September 13 |
Box 9 | Folder 855 | Ninth level, looking at north west corner | 1990 September 13 |
Box 9 | Folder 856 | Ninth level, fan room | 1990 September 13 |
Box 9 | Folder 857 | Tenth level, south exterior wall | 1990 September 13 |
Box 9 | Folder 858 | Tenth level, looking over south west corner of Winter Garden | 1990 September 13 |
Box 9 | Folder 859 | Eleventh level, cooling towers | 1990 September 13 |
Box 9 | Folder 860 | North elevation | 1990 September 13 |
Box 9 | Folder 861 | East elevation | 1990 September 13 |
Box 9 | Folder 862 | West elevation | 1990 September 13 |
Box 9 | Folder 863 | South west corner, elevation | 1990 September 13 |
Box 9 | Folder 864 | South east corner, elevation | 1990 September 13 |
Box 9 | Folder 865 | East elevation | 1990 September 26 |
Box 9 | Folder 866 | West elevation | 1990 September 26 |
Box 9 | Folder 867 | North elevation | 1990 September 26 |
Box 9 | Folder 868 | South half roof | 1990 September 26 |
Box 9 | Folder 869 | North half roof | 1990 September 26 |
Box 9 | Folder 870 | South east corner, elevation | 1990 September 26 |
Box 9 | Folder 871 | Lower level, audio-visual studio | 1990 September 26 |
Box 9 | Folder 872 | Lower level, corridor | 1990 September 26 |
Box 9 | Folder 873 | Lower level, mechanical equipment | 1990 September 26 |
Box 9 | Folder 874 | Ground level, main lobby drywall | 1990 September 26 |
Box 9 | Folder 875 | Ground level, south corridor | 1990 September 26 |
Box 9 | Folder 876 | Congress Parkway, site work | 1990 September 26 |
Box 9 | Folder 877 | Third level, looking south | 1990 September 26 |
Box 9 | Folder 878 | Third level, top of escalators | 1990 September 26 |
Box 9 | Folder 879 | Third level, terrazzo | 1990 September 26 |
Box 9 | Folder 880 | Third level, arched window | 1990 September 26 |
Box 9 | Folder 881 | Fourth level, looking north east | 1990 September 26 |
Box 9 | Folder 882 | Fifth level, elevator lobby | 1990 September 26 |
Box 9 | Folder 883 | Fifth level, south elevation, brick | 1990 September 26 |
Box 9 | Folder 884 | Sixth level, corridor terrazzo | 1990 September 26 |
Box 9 | Folder 885 | Sixth level, east alcoves | 1990 September 26 |
Box 9 | Folder 886 | Seventh level, escalator railings | 1990 September 26 |
Box 9 | Folder 887 | Eighth level, lobby ceiling | 1990 September 26 |
Box 9 | Folder 888 | Eighth level, block back-up | 1990 September 26 |
Box 9 | Folder 889 | Ninth level, looking at north east corner | 1990 September 26 |
Box 9 | Folder 890 | Ninth level, south west family room | 1990 September 26 |
Box 9 | Folder 891 | Tenth level, west pediment wall glass | 1990 September 26 |
Box 9 | Folder 892 | Tenth level, inter block | 1990 September 26 |
Box 9 | Folder 893 | Tenth level, looking down at Winter Garden scaffolding | 1990 September 26 |
Box 9 | Folder 894 | South east corner of roof | 1990 September 26 |
Box 9 | Folder 895 | East barrel roof | 1990 September 26 |
Box 9 | Folder 896 | Second level, Children’s Library | 1990 September 26 |
Box 9 | Folder 897 | Fourth level, looking east | 1990 September 26 |
Box 9 | Folder 898 | Lower level, water lines welding | 1990 October 12 |
Box 9 | Folder 899 | Lower level, chiller control panel | 1990 October 12 |
Box 9 | Folder 900 | Mezzanine, Smart Room, raised floor | 1990 October 12 |
Box 10 | Folder 901 | Ground level, elevator lobby lights | 1990 October 12 |
Box 10 | Folder 902 | Exterior curtain wall molding | 1990 October 12 |
Box 10 | Folder 903 | Ground level, pull heating and wire | 1990 October 12 |
Box 10 | Folder 904 | Exterior granite work | 1990 October 12 |
Box 10 | Folder 905 | Main entrance, door frame | 1990 October 12 |
Box 10 | Folder 906 | Second level, lobby ceiling plaster | 1990 October 12 |
Box 10 | Folder 907 | Second level, hydraulic elevator | 1990 October 12 |
Box 10 | Folder 908 | Third level, wire mesh at elevator | 1990 October 12 |
Box 10 | Folder 909 | Third level, setting sprinkler head | 1990 October 12 |
Box 10 | Folder 910 | Fourth level, escalator framing | 1990 October 12 |
Box 10 | Folder 911 | Fourth level, light fixtures | 1990 October 12 |
Box 10 | Folder 912 | Fifth level, ceiling plaster molding | 1990 October 12 |
Box 10 | Folder 913 | Fifth level, alcove drywall | 1990 October 12 |
Box 10 | Folder 914 | Sixth level, setting sprinkler heads | 1990 October 12 |
Box 10 | Folder 915 | Sixth level, terrazzo | 1990 October 12 |
Box 10 | Folder 916 | Seventh level, elevator door butts | 1990 October 12 |
Box 10 | Folder 917 | Seventh level, terrazzo cove base | 1990 October 12 |
Box 10 | Folder 918 | Eighth level, vaulted ceiling | 1990 October 12 |
Box 10 | Folder 919 | Eighth level, exterior stone setting | 1990 October 12 |
Box 10 | Folder 920 | Ninth level, cooling coil piping | 1990 October 12 |
Box 10 | Folder 921 | Ninth level, drywall | 1990 October 12 |
Box 10 | Folder 922 | Tenth level, window glazing | 1990 October 12 |
Box 10 | Folder 923 | Tenth level, pipe cutting for MCC | 1990 October 12 |
Box 10 | Folder 924 | South half of roof | 1990 October 12 |
Box 10 | Folder 925 | North half of roof | 1990 October 12 |
Box 10 | Folder 926 | North elevation | 1990 October 12 |
Box 10 | Folder 927 | East elevation | 1990 October 12 |
Box 10 | Folder 928 | West elevation | 1990 October 12 |
Box 10 | Folder 929 | South elevation | 1990 October 12 |
Box 10 | Folder 930 | South east corner, elevation | 1990 October 12 |
Box 10 | Folder 931 | South east corner, elevation | 1990 October 25 |
Box 10 | Folder 932 | North elevation | 1990 October 25 |
Box 10 | Folder 933 | Cornice welding | 1990 October 25 |
Box 10 | Folder 934 | Cornice arch | 1990 October 25 |
Box 10 | Folder 935 | Tenth level, painting barrel arches | 1990 October 25 |
Box 10 | Folder 936 | Tenth level, metal studs | 1990 October 25 |
Box 10 | Folder 937 | Ninth level, water pipe cover sealer | 1990 October 25 |
Box 10 | Folder 938 | Ninth level, metal stud insulation | 1990 October 25 |
Box 10 | Folder 939 | Ninth level, entrance pediment stut framing | 1990 October 25 |
Box 10 | Folder 940 | Eighth level, escalator installation | 1990 October 25 |
Box 10 | Folder 941 | Eighth level, glazer | 1990 October 25 |
Box 10 | Folder 942 | Seventh level, brick work | 1990 October 25 |
Box 10 | Folder 943 | Seventh level, north east corner, ceiling grid | 1990 October 25 |
Box 10 | Folder 944 | Sixth level, terrazzo | 1990 October 25 |
Box 10 | Folder 945 | Sixth level, stone work | 1990 October 25 |
Box 10 | Folder 946 | Fifth level, escalator framing | 1990 October 25 |
Box 10 | Folder 947 | Fifth level, reading room | 1990 October 25 |
Box 10 | Folder 948 | Ninth level, stairwell drywall | 1990 October 25 |
Box 10 | Folder 949 | Fourth level | 1990 October 25 |
Box 10 | Folder 950 | Third level, terrazzo | 1990 October 25 |
Box 10 | Folder 951 | Second level, drywall standing | 1990 October 25 |
Box 10 | Folder 952 | Second level, general view of GFRG | 1990 October 25 |
Box 10 | Folder 953 | Second level, pulling floor cell wire | 1990 October 25 |
Box 10 | Folder 954 | Ground level, main entrance, plastering | 1990 October 25 |
Box 10 | Folder 955 | Ground level, caulking at arch window | 1990 October 25 |
Box 10 | Folder 956 | Ground level, fire alarm | 1990 October 25 |
Box 10 | Folder 957 | Lower level, plastering at main lobby | 1990 October 25 |
Box 10 | Folder 958 | Exterior, south end, preparation for sidewalk | 1990 October 25 |
Box 10 | Folder 959 | Ground level, auditorium cat-walk | 1990 October 25 |
Box 10 | Folder 960 | West elevation | 1990 October 25 |
Box 10 | Folder 961 | North half of roof | 1990 October 25 |
Box 10 | Folder 962 | South half of roof | 1990 October 25 |
Box 10 | Folder 963 | East elevation | 1990 October 25 |
Box 10 | Folder 964 | North elevation, north west corner | 1990 November 8 |
Box 10 | Folder 965 | North elevation | 1990 November 8 |
Box 10 | Folder 966 | East elevation | 1990 November 8 |
Box 10 | Folder 967 | South east corner | 1990 November 8 |
Box 10 | Folder 968 | South elevation | 1990 November 8 |
Box 10 | Folder 969 | West elevation | 1990 November 8 |
Box 10 | Folder 970 | South east corner of roof | 1990 November 8 |
Box 10 | Folder 971 | Tenth level, east side of Winter Garden bridge | 1990 November 8 |
Box 10 | Folder 972 | Ninth level, south west corner of Winter Garden, GFRG molding | 1990 November 8 |
Box 10 | Folder 973 | Tenth level, Winter Garden | 1990 November 8 |
Box 10 | Folder 974 | Ninth level, west, hanging sheet rock | 1990 November 8 |
Box 10 | Folder 975 | Eighth level, ceiling grid and terrazzo installation | 1990 November 8 |
Box 10 | Folder 976 | Seventh level, arch of arch curtain wall | 1990 November 8 |
Box 10 | Folder 977 | South elevation, setting festoon and swags | 1990 November 8 |
Box 10 | Folder 978 | Seventh level, south elevation, brick work on arch | 1990 November 8 |
Box 10 | Folder 979 | Sixth level, grinding terrazzo, plastering, reading room | 1990 November 8 |
Box 10 | Folder 980 | Sixth level, plastering wall, elevator doors installed | 1990 November 8 |
Box 10 | Folder 981 | Fifth level, cleaning up elevator doors | 1990 November 8 |
Box 10 | Folder 982 | Fifth level, cutting sprinkler pipe, installing light fixtures | 1990 November 8 |
Box 10 | Folder 983 | Fourth level, carpet installation, acoustical tile in | 1990 November 8 |
Box 10 | Folder 984 | Fourth level, installing trim | 1990 November 8 |
Box 10 | Folder 985 | Third level, testing sprinkler pipes | 1990 November 8 |
Box 10 | Folder 986 | Third level, acoustical tile | 1990 November 8 |
Box 10 | Folder 987 | Second level, making ornamental decorative trim | 1990 November 8 |
Box 10 | Folder 988 | Second level, marble ledge piece | 1990 November 8 |
Box 10 | Folder 989 | Second level, installing mobile system library rails | 1990 November 8 |
Box 10 | Folder 990 | Ground level, east side, finish plaster, arch | 1990 November 8 |
Box 10 | Folder 991 | Ground level, west side auditorium, blocking in | 1990 November 8 |
Box 10 | Folder 992 | Lower level, room east of auditorium | 1990 November 8 |
Box 10 | Folder 993 | Lower level, multipurpose room, acoustic grid work | 1990 November 8 |
Box 10 | Folder 994 | North half of roof | 1990 November 8 |
Box 10 | Folder 995 | South half of roof | 1990 November 8 |
Box 10 | Folder 996 | Exterior, north ground level, archway | 1990 November 8 |
Box 10 | Folder 997 | Tenth level | 1990 November 21 |
Box 10 | Folder 998 | Ninth level, exterior walkway | 1990 November 21 |
Box 10 | Folder 999 | Ninth level, north corridor | 1990 November 21 |
Box 10 | Folder 1000 | Ninth level, Winter Garden | 1990 November 21 |
Box 11 | Folder 1001 | Eighth level, terrazzo | 1990 November 21 |
Box 11 | Folder 1002 | Eighth level, escalator landing | 1990 November 21 |
Box 11 | Folder 1003 | Seventh level, south west corner, brick arch | 1990 November 21 |
Box 11 | Folder 1004 | Seventh level, east corridor | 1990 November 21 |
Box 11 | Folder 1005 | Seventh level, looking at north east corner | 1990 November 21 |
Box 11 | Folder 1006 | Sixth level, looking north | 1990 November 21 |
Box 11 | Folder 1007 | Sixth level, escalator landing | 1990 November 21 |
Box 11 | Folder 1008 | Fifth level, compact storage | 1990 November 21 |
Box 11 | Folder 1009 | Fifth level, escalator lobby | 1990 November 21 |
Box 11 | Folder 1010 | Fourth level, north corridor | 1990 November 21 |
Box 11 | Folder 1011 | Fourth level, wood trim | 1990 November 21 |
Box 11 | Folder 1012 | Fourth level, alcove stone | 1990 November 21 |
Box 11 | Folder 1013 | Third level | 1990 November 21 |
Box 11 | Folder 1014 | Third level, escalator landing | 1990 November 21 |
Box 11 | Folder 1015 | Second level, elevator lobby stone | 1990 November 21 |
Box 11 | Folder 1016 | Second level, complex lobby | 1990 November 21 |
Box 11 | Folder 1017 | Second level, lobby ceiling | 1990 November 21 |
Box 11 | Folder 1018 | Second level, lobby window | 1990 November 21 |
Box 11 | Folder 1019 | Second level, Children’s Library | 1990 November 21 |
Box 11 | Folder 1020 | Lower level, TC/AV studio | 1990 November 21 |
Box 11 | Folder 1021 | Ground level, east | 1990 November 21 |
Box 11 | Folder 1022 | Ground level, corridor | 1990 November 21 |
Box 11 | Folder 1023 | East elevation | 1990 November 21 |
Box 11 | Folder 1024 | North elevation | 1990 November 21 |
Box 11 | Folder 1025 | North half of roof | 1990 November 21 |
Box 11 | Folder 1026 | South half of roof | 1990 November 21 |
Box 11 | Folder 1027 | West elevation | 1990 November 21 |
Box 11 | Folder 1028 | South elevation | 1990 November 21 |
Box 11 | Folder 1029 | South east corner, elevation | 1990 November 21 |
Box 11 | Folder 1030 | South east corner, elevation | 1990 December 13 |
Box 11 | Folder 1031 | East elevation | 1990 December 13 |
Box 11 | Folder 1032 | East elevation, mid-section | 1990 December 13 |
Box 11 | Folder 1033 | Stonework, south elevation | 1990 December 13 |
Box 11 | Folder 1034 | South elevation | 1990 December 13 |
Box 11 | Folder 1035 | West elevation | 1990 December 13 |
Box 11 | Folder 1036 | West elevation | 1990 December 13 |
Box 11 | Folder 1037 | Auditorium | 1990 December 13 |
Box 11 | Folder 1038 | Lower level, complex lobby | 1990 December 13 |
Box 11 | Folder 1039 | Ground level, south corridor | 1990 December 13 |
Box 11 | Folder 1040 | Ground level, north east corridor | 1990 December 13 |
Box 11 | Folder 1041 | Second level, Children’s Library | 1990 December 13 |
Box 11 | Folder 1042 | Second level, complex lobby | 1990 December 13 |
Box 11 | Folder 1043 | Third level, east escalator lobby | 1990 December 13 |
Box 11 | Folder 1044 | Third level, escalator enclosure | 1990 December 13 |
Box 11 | Folder 1045 | Fourth level, north, arched window | 1990 December 13 |
Box 11 | Folder 1046 | Fourth level, reading alcoves | 1990 December 13 |
Box 11 | Folder 1047 | Fourth level, reference desk | 1990 December 13 |
Box 11 | Folder 1048 | Fifth level, reading room | 1990 December 13 |
Box 11 | Folder 1049 | Fifth level, north side, glass installation | 1990 December 13 |
Box 11 | Folder 1050 | Sixth level, east alcove, stone installation | 1990 December 13 |
Box 11 | Folder 1051 | Sixth level, millwork | 1990 December 13 |
Box 11 | Folder 1052 | Seventh level, south side, arched window framing | 1990 December 13 |
Box 11 | Folder 1053 | Seventh level, east alcove, plaster | 1990 December 13 |
Box 11 | Folder 1054 | Eighth level, elevator lobby | 1990 December 13 |
Box 11 | Folder 1055 | Eighth level, east corridor | 1990 December 13 |
Box 11 | Folder 1056 | Ninth level, east balcony | 1990 December 13 |
Box 11 | Folder 1057 | Ninth level, Winter Garden | 1990 December 13 |
Box 11 | Folder 1058 | Ninth level, north elevation, Winter Garden | 1990 December 13 |
Box 11 | Folder 1059 | Ninth level, Winter Garden lights | 1990 December 13 |
Box 11 | Folder 1060 | South east corner of roof | 1990 December 13 |
Box 11 | Folder 1061 | South half of roof | 1990 December 13 |
Box 11 | Folder 1062 | North half of roof | 1990 December 13 |
Box 11 | Folder 1063 | Ninth level, north east corner, wall framing | 1990 December 28 |
Box 11 | Folder 1064 | Ninth level, north west corner, Winter Garden | 1990 December 28 |
Box 11 | Folder 1065 | Ninth level, east, Winter Garden | 1990 December 28 |
Box 11 | Folder 1066 | Ninth level, escalator north | 1990 December 28 |
Box 11 | Folder 1067 | S. rest ground floor on balconies | 1990 December 28 |
Box 11 | Folder 1068 | Eighth level, east hallway ceiling | 1990 December 28 |
Box 11 | Folder 1069 | Eighth level, escalator enclosure | 1990 December 28 |
Box 11 | Folder 1070 | Eighth level, platform for shelving system | 1990 December 28 |
Box 11 | Folder 1071 | Seventh level, north, arch window | 1990 December 28 |
Box 11 | Folder 1072 | Seventh level, plastering east reading alcove | 1990 December 28 |
Box 11 | Folder 1073 | Seventh level, meeting room, plaster and frame | 1990 December 28 |
Box 11 | Folder 1074 | Seventh level, finishing terrazzo | 1990 December 28 |
Box 11 | Folder 1075 | Sixth level, door hardware installation | 1990 December 28 |
Box 11 | Folder 1076 | Sixth level, two-story reading alcove | 1990 December 28 |
Box 11 | Folder 1077 | Sixth level, reading alcove | 1990 December 28 |
Box 11 | Folder 1078 | Sixth level, south, glazing arch window | 1990 December 28 |
Box 11 | Folder 1079 | Sixth level, support post for reception desk | 1990 December 28 |
Box 11 | Folder 1080 | Fifth level, wood base installation | 1990 December 28 |
Box 11 | Folder 1081 | Fifth level, bookshelf installation | 1990 December 28 |
Box 11 | Folder 1082 | Fifth level, compact shelving installation | 1990 December 28 |
Box 11 | Folder 1083 | Fifth level, touchup ceiling taping | 1990 December 28 |
Box 11 | Folder 1084 | Fifth level, chair rail installation | 1990 December 28 |
Box 11 | Folder 1085 | Fourth level, reception desk assembly | 1990 December 28 |
Box 11 | Folder 1086 | Bathroom fixtures and partitions | 1990 December 28 |
Box 11 | Folder 1087 | Fourth level, marble wainscot installation | 1990 December 28 |
Box 11 | Folder 1088 | Third level, escalator enclosure, maple | 1990 December 28 |
Box 11 | Folder 1089 | Third level, escalator lobby | 1990 December 28 |
Box 11 | Folder 1090 | Second level, carpet installation | 1990 December 28 |
Box 11 | Folder 1091 | Mezzanine looking down to grand lobby | 1990 December 28 |
Box 11 | Folder 1092 | Ground level, grand lobby looking up | 1990 December 28 |
Box 11 | Folder 1093 | West elevation | 1990 December 28 |
Box 11 | Folder 1094 | North elevation | 1990 December 28 |
Box 11 | Folder 1095 | East elevation | 1990 December 28 |
Box 11 | Folder 1096 | South east corner, elevation | 1990 December 28 |
Box 11 | Folder 1097 | South elevation | 1990 December 28 |
Box 11 | Folder 1098 | South west corner, elevation | 1990 December 28 |
Box 11 | Folder 1099 | South west corner, elevation | 1990 December 28 |
Box 11 | Folder 1100 | South half of roof | 1990 December 28 |
Box 12 | Folder 1101 | North half of roof | 1990 December 28 |
Box 12 | Folder 1102 | Lower level, audio/visual auditorium | 1991 January 17 |
Box 12 | Folder 1103 | Lower level, auditorium | 1991 January 17 |
Box 12 | Folder 1104 | Lower level, complex lobby | 1991 January 17 |
Box 12 | Folder 1105 | Ground level, north east corridor | 1991 January 17 |
Box 12 | Folder 1106 | Ground level, complex lobby | 1991 January 17 |
Box 12 | Folder 1107 | Ground level, south corridor | 1991 January 17 |
Box 12 | Folder 1108 | Second level, north end | 1991 January 17 |
Box 12 | Folder 1109 | Second level, south end | 1991 January 17 |
Box 12 | Folder 1110 | Third level, escalator lobby | 1991 January 17 |
Box 12 | Folder 1111 | Third level, east window finishes | 1991 January 17 |
Box 12 | Folder 1112 | Fourth level, escalator enclosure | 1991 January 17 |
Box 12 | Folder 1113 | Fourth level, reading room | 1991 January 17 |
Box 12 | Folder 1114 | Fifth level, circulation desk | 1991 January 17 |
Box 12 | Folder 1115 | Fifth level | 1991 January 17 |
Box 12 | Folder 1116 | Sixth level | 1991 January 17 |
Box 12 | Folder 1117 | Sixth level, reading carrel | 1991 January 17 |
Box 12 | Folder 1118 | Seventh level, east corridor | 1991 January 17 |
Box 12 | Folder 1119 | Seventh level, Author’s Room | 1991 January 17 |
Box 12 | Folder 1120 | Eighth level, circulation desk | 1991 January 17 |
Box 12 | Folder 1121 | Eighth level, west wall | 1991 January 17 |
Box 12 | Folder 1122 | Tenth level, looking down into Winter Garden | 1991 January 17 |
Box 12 | Folder 1123 | Ninth level, elevator lobby | 1991 January 17 |
Box 12 | Folder 1124 | Tenth level, bathroom walls | 1991 January 17 |
Box 12 | Folder 1125 | Tenth level, looking down into Winter Garden | 1991 January 17 |
Box 12 | Folder 1126 | Elevator room | 1991 January 17 |
Box 12 | Folder 1127 | North mechanical room | 1991 January 17 |
Box 12 | Folder 1128 | North half of roof | 1991 January 17 |
Box 12 | Folder 1129 | South half of roof | 1991 January 17 |
Box 12 | Folder 1130 | North elevation | 1991 January 17 |
Box 12 | Folder 1131 | East elevation | 1991 January 17 |
Box 12 | Folder 1132 | South elevation | 1991 January 17 |
Box 12 | Folder 1133 | West elevation | 1991 January 17 |
Box 12 | Folder 1134 | South east corner, elevation | 1991 January 17 |
Box 12 | Folder 1135 | North elevation | 1991 January 31 |
Box 12 | Folder 1136 | South east corner roof line | 1991 January 31 |
Box 12 | Folder 1137 | East elevation | 1991 January 31 |
Box 12 | Folder 1138 | South east corner elevation | 1991 January 31 |
Box 12 | Folder 1139 | South elevation | 1991 January 31 |
Box 12 | Folder 1140 | West elevation | 1991 January 31 |
Box 12 | Folder 1141 | Tenth level, north elevator lobby | 1991 January 31 |
Box 12 | Folder 1142 | Winter Garden looking east | 1991 January 31 |
Box 12 | Folder 1143 | Tenth level, south east, duct work installation | 1991 January 31 |
Box 12 | Folder 1144 | Tenth level, bridge looking north | 1991 January 31 |
Box 12 | Folder 1145 | Tenth level, looking down into Winter Garden, plastering | 1991 January 31 |
Box 12 | Folder 1146 | Tenth level, looking down into Winter Garden, marble installation | 1991 January 31 |
Box 12 | Folder 1147 | Ninth level, east corridor GFRG installation | 1991 January 31 |
Box 12 | Folder 1148 | Eighth level, east wall rocked | 1991 January 31 |
Box 12 | Folder 1149 | Seventh level, escalator bank | 1991 January 31 |
Box 12 | Folder 1150 | Eighth and ninth levels, escalator enclosure | 1991 January 31 |
Box 12 | Folder 1151 | Seventh level, study alcove | 1991 January 31 |
Box 12 | Folder 1152 | Sixth level, block stacks, tables, column finishing | 1991 January 31 |
Box 12 | Folder 1153 | Sixth level, modular furniture installation | 1991 January 31 |
Box 12 | Folder 1154 | Fifth level, desk installation | 1991 January 31 |
Box 12 | Folder 1155 | Terrazzo | 1991 January 31 |
Box 12 | Folder 1156 | Fourth level, south | 1991 January 31 |
Box 12 | Folder 1157 | Two-story reading alcove ceiling | 1991 January 31 |
Box 12 | Folder 1158 | North alcove | 1991 January 31 |
Box 12 | Folder 1159 | Third level, marble wainscot | 1991 January 31 |
Box 12 | Folder 1160 | Escalator handrail installation | 1991 January 31 |
Box 12 | Folder 1161 | Third level, reference desk | 1991 January 31 |
Box 12 | Folder 1162 | Mezzanine, looking down to north end of main lobby | 1991 January 31 |
Box 12 | Folder 1163 | Second level, Children’s Library | 1991 January 31 |
Box 12 | Folder 1164 | Lower level, lobby | 1991 January 31 |
Box 12 | Folder 1165 | Ground level, main entry doors | 1991 January 31 |
Box 12 | Folder 1166 | North half of roof | 1991 January 31 |
Box 12 | Folder 1167 | South half of roof | 1991 January 31 |
Box 12 | Folder 1168 | Tenth level, south east corner, drywall | 1991 February 18 |
Box 12 | Folder 1169 | Tenth level, bridge looking north | 1991 February 18 |
Box 12 | Folder 1170 | Tenth level, Winter Garden looking south west | 1991 February 18 |
Box 12 | Folder 1171 | Tenth level, north, stud work | 1991 February 18 |
Box 12 | Folder 1172 | Tenth level, elevator lobby | 1991 February 18 |
Box 12 | Folder 1173 | Tenth level, service corridor ceiling work | 1991 February 18 |
Box 12 | Folder 1174 | Ninth level, elevator lobby | 1991 February 18 |
Box 12 | Folder 1175 | Ninth level, Winter Garden looking south east | 1991 February 18 |
Box 12 | Folder 1176 | Ninth level, Winter Garden looking north west | 1991 February 18 |
Box 12 | Folder 1177 | Ninth level, public restaurant, looking south west | 1991 February 18 |
Box 12 | Folder 1178 | Ninth level, south west mechanical room | 1991 February 18 |
Box 12 | Folder 1179 | Ninth level, staff lounge | 1991 February 18 |
Box 12 | Folder 1180 | Eighth level, north, closed stack area | 1991 February 18 |
Box 12 | Folder 1181 | Eighth level, south reference desk | 1991 February 18 |
Box 12 | Folder 1182 | Eighth level, south, stack area | 1991 February 18 |
Box 12 | Folder 1183 | Eighth level, south, compact shelving | 1991 February 18 |
Box 12 | Folder 1184 | Eighth level, north escalator down to seventh level | 1991 February 18 |
Box 12 | Folder 1185 | Eighth level, elevator/escalator lobby | 1991 February 18 |
Box 12 | Folder 1186 | Seventh level, south perimeter looking east | 1991 February 18 |
Box 12 | Folder 1187 | Seventh level, north, stack area | 1991 February 18 |
Box 12 | Folder 1188 | Seventh level, Chicago Authors’ Room | 1991 February 18 |
Box 12 | Folder 1189 | Seventh level, north reference desk | 1991 February 18 |
Box 12 | Folder 1190 | Seventh level, north escalators | 1991 February 18 |
Box 12 | Folder 1191 | Seventh level, alcove, looking north east | 1991 February 18 |
Box 12 | Folder 1192 | Sixth level, north perimeter looking north | 1991 February 18 |
Box 12 | Folder 1193 | Sixth level, east reading alcove | 1991 February 18 |
Box 12 | Folder 1194 | Sixth level, center corridor looking west | 1991 February 18 |
Box 12 | Folder 1195 | Elevator lobby, looking north | 1991 February 18 |
Box 12 | Folder 1196 | Sixth level, north, staff area | 1991 February 18 |
Box 12 | Folder 1197 | Sixth level, service corridor looking south | 1991 February 18 |
Box 12 | Folder 1198 | Fifth level, east perimeter corridor, looking north | 1991 February 18 |
Box 12 | Folder 1199 | Fifth level, stack/reading area east of escalator | 1991 February 18 |
Box 12 | Folder 1200 | Fifth level, north, closed reading area | 1991 February 18 |
Box 13 | Folder 1201 | Fourth level, north half of service corridor | 1991 February 18 |
Box 13 | Folder 1202 | Fourth level, north perimeter corridor, looking south east | 1991 February 18 |
Box 13 | Folder 1203 | Fourth level, east reading alcove | 1991 February 18 |
Box 13 | Folder 1204 | Fourth level, reading center, looking west | 1991 February 18 |
Box 13 | Folder 1205 | Fourth level, two-story reading alcove | 1991 February 18 |
Box 13 | Folder 1206 | Fourth level, north reference desk, looking north | 1991 February 18 |
Box 13 | Folder 1207 | Third level, south reference desk, looking south west | 1991 February 18 |
Box 13 | Folder 1208 | Third level, south east, staff area | 1991 February 18 |
Box 13 | Folder 1209 | Third level, north perimeter corridor, looking west | 1991 February 18 |
Box 13 | Folder 1210 | Third level, floor entrance, book detectors | 1991 February 18 |
Box 13 | Folder 1211 | Third level, elevator lobby from escalator | 1991 February 18 |
Box 13 | Folder 1212 | Second level, main lobby ceiling | 1991 February 18 |
Box 13 | Folder 1213 | Second level, Children’s Library, stacks | 1991 February 18 |
Box 13 | Folder 1214 | Mezzanine level, looking down to north east of main lobby | 1991 February 18 |
Box 13 | Folder 1215 | Second level, elevator lobby, looking north | 1991 February 18 |
Box 13 | Folder 1216 | Second level, compact shelving | 1991 February 18 |
Box 13 | Folder 1217 | Ground level, Congress Corridor, looking north | 1991 February 18 |
Box 13 | Folder 1218 | Ground level, main lobby, north escalator | 1991 February 18 |
Box 13 | Folder 1219 | Ground level, main lobby, looking south east | 1991 February 18 |
Box 13 | Folder 1220 | Ground level, corridor north to Van Buren | 1991 February 18 |
Box 13 | Folder 1221 | Ground level, parking area, looking south | 1991 February 18 |
Box 13 | Folder 1222 | Lower level, auditorium | 1991 February 18 |
Box 13 | Folder 1223 | Lower level, mechanical room looking east | 1991 February 18 |
Box 13 | Folder 1224 | North half of roof | 1991 February 18 |
Box 13 | Folder 1225 | South half of roof | 1991 February 18 |
Box 13 | Folder 1226 | North elevation | 1991 February 18 |
Box 13 | Folder 1227 | East elevation | 1991 February 18 |
Box 13 | Folder 1228 | South elevation | 1991 February 18 |
Box 13 | Folder 1229 | West elevation | 1991 February 18 |
Box 13 | Folder 1230 | South east corner, elevation | 1991 February 18 |
Box 13 | Folder 1231 | South west corner, elevation | 1991 February 18 |
Box 13 | Folder 1232 | North west corner, elevation | 1991 February 18 |
Box 13 | Folder 1233 | North east corner, elevation | 1991 February 18 |
Box 13 | Folder 1234 | Tenth level, tenant duct work | 1991 February 28 |
Box 13 | Folder 1235 | Tenth level, tenant drywall work | 1991 February 28 |
Box 13 | Folder 1236 | Ninth level, looking down into Winter Garden, marble terrazzo | 1991 February 28 |
Box 13 | Folder 1237 | Tenth level, looking down into Winter Garden, marble terrazzo | 1991 February 28 |
Box 13 | Folder 1238 | Ninth level, added smoke detectors for corridors | 1991 February 28 |
Box 13 | Folder 1239 | Tenth level, tenant drywall | 1991 February 28 |
Box 13 | Folder 1240 | Tenth level, tenant sprinkler | 1991 February 28 |
Box 13 | Folder 1241 | Ninth level, installing ceiling tile | 1991 February 28 |
Box 13 | Folder 1242 | Ninth level, exterior, north west acroteria corner | 1991 February 28 |
Box 13 | Folder 1243 | Ninth/tenth levels, north east acroteria corner | 1991 February 28 |
Box 13 | Folder 1244 | Ninth/tenth levels, south east acroteria corner | 1991 February 28 |
Box 13 | Folder 1245 | Pork chop detail work | 1991 February 28 |
Box 13 | Folder 1246 | Ninth/tenth levels, south west acroteria corner | 1991 February 28 |
Box 13 | Folder 1247 | Eighth level, south west compact shelving | 1991 February 28 |
Box 13 | Folder 1248 | Eighth level, south west millwork | 1991 February 28 |
Box 13 | Folder 1249 | Eighth level, south escalator cladding | 1991 February 28 |
Box 13 | Folder 1250 | Eighth level, north | 1991 February 28 |
Box 13 | Folder 1251 | Eighth level, north shelving | 1991 February 28 |
Box 13 | Folder 1252 | Eighth level, looking south east | 1991 February 28 |
Box 13 | Folder 1253 | Eighth level, north shelving | 1991 February 28 |
Box 13 | Folder 1254 | Eighth level, elevator lobby | 1991 February 28 |
Box 13 | Folder 1255 | Seventh level, reference desk | 1991 February 28 |
Box 13 | Folder 1256 | Seventh level, women’s bathroom | 1991 February 28 |
Box 13 | Folder 1257 | Seventh level, south west compact shelving | 1991 February 28 |
Box 13 | Folder 1258 | Seventh level, south, millwork display cases | 1991 February 28 |
Box 13 | Folder 1259 | Seventh level, language laboratory TVAC | 1991 February 28 |
Box 13 | Folder 1260 | Seventh level, Chicago Authors’ Room | 1991 February 28 |
Box 13 | Folder 1261 | Seventh level, north east shelving | 1991 February 28 |
Box 13 | Folder 1262 | Seventh level, reading alcove | 1991 February 28 |
Box 13 | Folder 1263 | Seventh level, reading alcove | 1991 February 28 |
Box 13 | Folder 1264 | Seventh level, north west stair, drywall replacement | 1991 February 28 |
Box 13 | Folder 1265 | Seventh level, north corridor | 1991 February 28 |
Box 13 | Folder 1266 | Seventh level, north west staff area | 1991 February 28 |
Box 13 | Folder 1267 | Seventh level, north west, staff office | 1991 February 28 |
Box 13 | Folder 1268 | Seventh level, west service corridor | 1991 February 28 |
Box 13 | Folder 1269 | Sixth level, north corridor | 1991 February 28 |
Box 13 | Folder 1270 | Sixth level, west corridor | 1991 February 28 |
Box 13 | Folder 1271 | Sixth level, north shelving | 1991 February 28 |
Box 13 | Folder 1272 | Sixth level, two-story reading alcove | 1991 February 28 |
Box 13 | Folder 1273 | Sixth level, elevator lobby | 1991 February 28 |
Box 13 | Folder 1274 | Sixth level, reference desk | 1991 February 28 |
Box 13 | Folder 1275 | Sixth level, south, arched window | 1991 February 28 |
Box 13 | Folder 1276 | Sixth level, east corridor | 1991 February 28 |
Box 13 | Folder 1277 | Sixth level, south single closet | 1991 February 28 |
Box 13 | Folder 1278 | Sixth level, north west, staff area | 1991 February 28 |
Box 13 | Folder 1279 | Sixth level, elevator lobby | 1991 February 28 |
Box 13 | Folder 1280 | Fifth level, microfilm room | 1991 February 28 |
Box 13 | Folder 1281 | Fifth level, microfilm room, glazing | 1991 February 28 |
Box 13 | Folder 1282 | Fifth level, north corridor | 1991 February 28 |
Box 13 | Folder 1283 | Fifth level, north single closet | 1991 February 28 |
Box 13 | Folder 1284 | Fifth level, north, reading area | 1991 February 28 |
Box 13 | Folder 1285 | Fifth level, east corridor | 1991 February 28 |
Box 13 | Folder 1286 | Fifth level, center corridor | 1991 February 28 |
Box 13 | Folder 1287 | Fifth level, compact shelving, testing and balancing | 1991 February 28 |
Box 13 | Folder 1288 | Fifth level, south, testing and balancing | 1991 February 28 |
Box 13 | Folder 1289 | Fifth level, south, staff area | 1991 February 28 |
Box 13 | Folder 1290 | Fifth level, elevator lobby | 1991 February 28 |
Box 13 | Folder 1291 | Fifth level, west elevator closet | 1991 February 28 |
Box 13 | Folder 1292 | Fifth level, west single closet | 1991 February 28 |
Box 13 | Folder 1293 | Fourth level, microfilm room | 1991 February 28 |
Box 13 | Folder 1294 | Fourth level, south | 1991 February 28 |
Box 13 | Folder 1295 | Fourth level, reading alcove | 1991 February 28 |
Box 13 | Folder 1296 | Fourth level, center corridor | 1991 February 28 |
Box 13 | Folder 1297 | Fourth level, north west reading area | 1991 February 28 |
Box 13 | Folder 1298 | Fourth level, staff area | 1991 February 28 |
Box 13 | Folder 1299 | Fourth level, electrical closet | 1991 February 28 |
Box 13 | Folder 1300 | Fourth level, west single closet | 1991 February 28 |
Box 14 | Folder 1301 | Fourth level, west corridor, painting prep. Work | 1991 February 28 |
Box 14 | Folder 1302 | Fourth level, reference desk | 1991 February 28 |
Box 14 | Folder 1303 | Third level, reference desk | 1991 February 28 |
Box 14 | Folder 1304 | Third level, room 3N16, completing millwork after TCAV work | 1991 February 28 |
Box 14 | Folder 1305 | Third level, dumb waiter | 1991 February 28 |
Box 14 | Folder 1306 | Third level, north, staff area | 1991 February 28 |
Box 14 | Folder 1307 | Third level, north corridor | 1991 February 28 |
Box 14 | Folder 1308 | Third level, TVAC conduct run from room 3N16 to single closet | 1991 February 28 |
Box 14 | Folder 1309 | Third level, escalator lobby | 1991 February 28 |
Box 14 | Folder 1310 | Third level, south staff area | 1991 February 28 |
Box 14 | Folder 1311 | Second level, Children’s Library | 1991 February 28 |
Box 14 | Folder 1312 | Second level, TVAC multipurpose room | 1991 February 28 |
Box 14 | Folder 1313 | Second level, south telephone cable | 1991 February 28 |
Box 14 | Folder 1314 | Second level, west single closet | 1991 February 28 |
Box 14 | Folder 1315 | Second level, elevator lobby | 1991 February 28 |
Box 14 | Folder 1316 | Second level, north west corner | 1991 February 28 |
Box 14 | Folder 1317 | Second level, CTA corridor | 1991 February 28 |
Box 14 | Folder 1318 | Second level, north compact shelving | 1991 February 28 |
Box 14 | Folder 1319 | Mezzanine looking down into main lobby | 1991 February 28 |
Box 14 | Folder 1320 | Ground level, video room area | 1991 February 28 |
Box 14 | Folder 1321 | Ground level, south corridor | 1991 February 28 |
Box 14 | Folder 1322 | Ground level, elevator, west corridor | 1991 February 28 |
Box 14 | Folder 1323 | Ground level, north dock area | 1991 February 28 |
Box 14 | Folder 1324 | Ground level, north entry | 1991 February 28 |
Box 14 | Folder 1325 | Ground level, TVAC battery racks | 1991 February 28 |
Box 14 | Folder 1326 | Ground level, electrical closet | 1991 February 28 |
Box 14 | Folder 1327 | Lower level, auditorium TCAV work | 1991 February 28 |
Box 14 | Folder 1328 | Ground level, main entry | 1991 February 28 |
Box 14 | Folder 1329 | Ground level, tenant area | 1991 February 28 |
Box 14 | Folder 1330 | Exterior, south elevation and air intake/exhaust | 1991 February 28 |
Box 14 | Folder 1331 | East elevation and air intake | 1991 February 28 |
Box 14 | Folder 1332 | Lower level, lobby | 1991 February 28 |
Box 14 | Folder 1333 | Lower level, multipurpose room, TCAV work | 1991 February 28 |
Box 14 | Folder 1334 | Lower level, multipurpose room, TCAV work | 1991 February 28 |
Box 14 | Folder 1335 | South mechanical room | 1991 February 28 |
Box 14 | Folder 1336 | South mechanical room | 1991 February 28 |
Box 14 | Folder 1337 | North east mechanical room | 1991 February 28 |
Box 14 | Folder 1338 | North west mechanical room | 1991 February 28 |
Box 14 | Folder 1339 | North half of roof | 1991 February 28 |
Box 14 | Folder 1340 | South half of roof | 1991 February 28 |
Box 14 | Folder 1341 | West elevation | 1991 February 28 |
Box 14 | Folder 1342 | West elevation | 1991 February 28 |
Box 14 | Folder 1343 | North elevation | 1991 February 28 |
Box 14 | Folder 1344 | North elevation barrel | 1991 February 28 |
Box 14 | Folder 1345 | North elevation | 1991 February 28 |
Box 14 | Folder 1346 | East elevation | 1991 February 28 |
Box 14 | Folder 1347 | East elevation barrel | 1991 February 28 |
Box 14 | Folder 1348 | South east corner, elevation | 1991 February 28 |
Box 14 | Folder 1349 | Ninth level, south east corner, room 95 TCAV | 1991 March 7 |
Box 14 | Folder 1350 | Ninth level, north east corner, room 95 TCAV | 1991 March 7 |
Box 14 | Folder 1351 | Ninth level, north west corner, room 95 TCAV | 1991 March 7 |
Box 14 | Folder 1352 | Seventh level, Chicago Authors’ Room | 1991 March 7 |
Box 14 | Folder 1353 | Third level, room 3N16, TCAV | 1991 March 7 |
Box 14 | Folder 1354 | Lower level, multipurpose room, north wall, TCAV | 1991 March 7 |
Box 14 | Folder 1355 | Lower level, multipurpose room, west wall, TCAV | 1991 March 7 |
Box 14 | Folder 1356 | Lower level, multipurpose room, east wall, TCAV | 1991 March 7 |
Box 14 | Folder 1357 | Lower level, south east corner, TCAV | 1991 March 7 |
Box 14 | Folder 1358 | Lower level, west closet | 1991 March 7 |
Box 14 | Folder 1359 | Lower level, TCAV | 1991 March 7 |
Box 14 | Folder 1360 | Lower level, TCAV | 1991 March 7 |
Box 14 | Folder 1361 | Lower level, east wall, west similar, TCAV | 1991 March 7 |
Box 14 | Folder 1362 | Lower level, east wall, west similar, TCAV | 1991 March 7 |
Box 14 | Folder 1363 | Lower level, stage, west wall, east similar | 1991 March 7 |
Box 14 | Folder 1364 | Lower level, south, RF shielding room | 1991 March 7 |
Box 14 | Folder 1365 | Lower level, north, RF shielding room, back area | 1991 March 7 |
Box 14 | Folder 1366 | Lower level, small video auditorium, south wall | 1991 March 7 |
Box 14 | Folder 1367 | Lower level, video auditorium, east wall | 1991 March 7 |
Box 14 | Folder 1368 | Tenth level, tenant work elevator lobby | 1991 March 14 |
Box 14 | Folder 1369 | Tenth level, tenant duct work relocation | 1991 March 14 |
Box 14 | Folder 1370 | Tenth level, looking down into Winter Garden | 1991 March 14 |
Box 14 | Folder 1371 | Tenth level, tenant work, south side | 1991 March 14 |
Box 14 | Folder 1372 | Ninth level, missing sprinkler heads | 1991 March 14 |
Box 14 | Folder 1373 | Ninth level, elevator lobby | 1991 March 14 |
Box 14 | Folder 1374 | Ninth level, staff lounge | 1991 March 14 |
Box 14 | Folder 1375 | Eighth level, missing millwork at elevator lobby | 1991 March 14 |
Box 14 | Folder 1376 | Eighth level, missing light at east elevation | 1991 March 14 |
Box 14 | Folder 1377 | Eighth level, millwork | 1991 March 14 |
Box 14 | Folder 1378 | Eighth level, installing glass stops | 1991 March 14 |
Box 14 | Folder 1379 | Eighth level, millwork installation | 1991 March 14 |
Box 14 | Folder 1380 | Seventh level, Chicago Authors’ Room | 1991 March 14 |
Box 14 | Folder 1381 | Fifth level, north reference desk | 1991 March 14 |
Box 14 | Folder 1382 | Fourth level, room 4N10, TCAV | 1991 March 14 |
Box 14 | Folder 1383 | Third level, north check-in desk | 1991 March 14 |
Box 14 | Folder 1384 | Third level, dumbwaiter | 1991 March 14 |
Box 14 | Folder 1385 | Second level, south west, 1BC cable | 1991 March 14 |
Box 14 | Folder 1386 | Second level, toddler area | 1991 March 14 |
Box 14 | Folder 1387 | Second level, children’s multipurpose room, TCAV | 1991 March 14 |
Box 14 | Folder 1388 | Second level, Children’s Library, 6 foot high rooms | 1991 March 14 |
Box 14 | Folder 1389 | Second level, CTA future connection | 1991 March 14 |
Box 14 | Folder 1390 | Ground level, museum | 1991 March 14 |
Box 14 | Folder 1391 | Ground level, film/video room | 1991 March 14 |
Box 14 | Folder 1392 | Ground level, TCAV relocating battery panels | 1991 March 14 |
Box 14 | Folder 1393 | Ground level, TCAV, east side of auditorium | 1991 March 14 |
Box 14 | Folder 1394 | Lower level, auditorium | 1991 March 14 |
Box 14 | Folder 1395 | Lower level, video auditorium TCAV work | 1991 March 14 |
Box 14 | Folder 1396 | Lower level, south east, staff offices progress | 1991 March 14 |
Box 14 | Folder 1397 | Lower level, room 0N20, TCAV work | 1991 March 14 |
Box 14 | Folder 1398 | Lower level, TCAV in video studio | 1991 March 14 |
Box 14 | Folder 1399 | Lower level, TCAV in video studio | 1991 March 14 |
Box 14 | Folder 1400 | Lower level, progress of vinyl tile | 1991 March 14 |
Box 14 | Folder 1401 | Lower level, TCAV in auditorium at the stage | 1991 March 14 |
Box 14 | Folder 1402 | Lower level, TCAV in projection room | 1991 March 14 |
Box 14 | Folder 1403 | Lower level, south mechanical room | 1991 March 14 |
Box 14 | Folder 1404 | Lower level, mechanical room | 1991 March 14 |
Box 14 | Folder 1405 | South east corner, elevation | 1991 March 14 |
Box 14 | Folder 1406 | South elevation | 1991 March 14 |
Box 14 | Folder 1407 | West elevation | 1991 March 14 |
Box 14 | Folder 1408 | North half of roof | 1991 March 14 |
Box 14 | Folder 1409 | South half of roof | 1991 March 14 |
Box 14 | Folder 1410 | North elevation | 1991 March 14 |
Box 14 | Folder 1411 | East elevation | 1991 March 14 |